The Evaluation of Emergency Capacity for Construction Project

被引:0
|
作者
Han Xishuang [1 ]
Wang Yaowu [1 ]
机构
[1] Harbin Inst Technol, Sch Management, Dept Construct & Real Estate, Harbin 150001, Peoples R China
关键词
construction project; emergency management; emergency capacity; evaluation model; triangular fuzzy number; SUPPORT;
D O I
暂无
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
Emergency response capacity for construction projects emergency, largely depend on the state of the project and other aspects, such as emergency resources and technical capacity after the emergency. Emergency project management capability framework is build based on the Monitoring early warning capabilities, emergency control capabilities, emergency rescue capabilities, emergency support capacity and restore capability, which were given for emergency response capacity evaluation index, as well as indicators for the evaluation of the emergency response capacity evaluation process. With the analysis of the characteristics for the emergency capacity construction, method is design for emergency capacity index weight, through Analytic Hierarchy Process based on triangular fuzzy numbers. The triangular fuzzy numbers complementary judgment matrix was calculated with application of triangular fuzzy numbers expansion theory and access to weight values of the emergency response capacity factors. Finally, the example of the survey, conducted on specific projects emergency capacity evaluation shows that the emergency response capacity of the project status for the emergency management further improvements provide a basis.
引用
收藏
页码:235 / 238
页数:4
相关论文
共 50 条
  • [1] The Fuzzy Project Construction Unit the Department of Safety Evaluation of Emergency Managemen
    Wu, Qian
    Wan, Meng
    Hu, Xin
    PROCEEDINGS OF THE INTERNATIONAL SYMPOSIUM ON EMERGENCY MANAGEMENT 2010, 2010, : 207 - 211
  • [2] Research on Emergency Management of Construction Project
    Xu, Sheng-deng
    PROCEEDINGS OF THE 22ND INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT: CORE THEORY AND APPLICATIONS OF INDUSTRIAL ENGINEERING (VOL 1), 2016, : 187 - 195
  • [3] Evaluation of Metro Construction Emergency Management Capacity based on COWA Operator and Grey Clustering
    Zhao, J. X.
    Wang, M. M.
    Wu, D. D.
    PROCEEDINGS OF THE 2017 3RD INTERNATIONAL FORUM ON ENERGY, ENVIRONMENT SCIENCE AND MATERIALS (IFEESM 2017), 2017, 120 : 26 - 31
  • [4] Emergency schedule in the risk assessment of the construction project
    Skorupka, Dariusz
    Prace Naukowe Instytutu Budownictwa Politechniki Wroclawskiej, 2008, (91): : 299 - 306
  • [5] Dynamic Evolution Model of Construction Project Emergency
    Liu Renhui
    PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2009, : 73 - 76
  • [6] CONSTRUCTION PROJECT EVALUATION PROGRAM
    SMITH, DG
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1983, 44 : 423 - 423
  • [7] Research on the Evaluation of Industrialized Construction Capacity of Construction Enterprises
    Song, Jian-min
    Zheng, Liu-yong
    Zhai, Lin-lin
    2015 INTERNATIONAL CONFERENCE ON APPLIED MECHANICS AND MECHATRONICS ENGINEERING (AMME 2015), 2015, : 754 - 759
  • [8] The Objective Evaluation of Road Construction Project
    Lin, Li
    Peng, Du
    Fei, Chai
    2007 INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-15, 2007, : 5224 - +
  • [9] CONSTRUCTION PROJECT EVALUATION PROGRAM UPDATE
    PATE, ZT
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1982, 43 : 554 - 555
  • [10] Construction of evaluation index system for emergency rescue capacity of rail transit under serious epidemic situation
    Chen D.-J.
    Sun Y.-H.
    Li J.-J.
    Ni S.-Q.
    Jiaotong Yunshu Gongcheng Xuebao/Journal of Traffic and Transportation Engineering, 2020, 20 (03): : 129 - 138