This paper introduces pioneering solution for upgrading 45 km, 115 kV double circuit line, built in 1922, in Ontario. To double the circuits' power transfer, the existing 605 kcmil ACSR was replaced with 997.2 kcmil ACSR/WT conductor and the thermal rating was increased from 85 degrees C to 150 degrees C. Visual inspection and probabilistic corrosion model were used to determine the severity of corrosion and to incorporate corrosion damages into analysis of the steel towers. Relocating the bottom phases to modified middle arms did not provide sufficient ground clearance and using conventional vertical extensions on existing grillage footings were impractical because it require large crane to lift the fully dressed tower, which was impossible in populated areas. Innovative solution using lighter shaft extension inserted above the tower's bend line was designed allowing the use of smaller crane thus considerably lowered material and construction costs. Further, galloping performance was improved by installing inter-phase spacers.
引用
收藏
页码:538 / 549
页数:12
相关论文
共 50 条
  • [21] Transforming Existing 220 kV Double Circuit Line into 400 kV Single Circuit Line in Romania
    Marginean, D.
    Mateescu, E.
    Wechsler, H. S.
    Florea, G.
    Matea, C.
    2011 IEEE PES 12TH INTERNATIONAL CONFERENCE ON TRANSMISSION AND DISTRIBUTION CONSTRUCTION, OPERATION AND LIVE-LINE MAINTENANCE (ESMO), 2011,
  • [22] Best Practices for the Design of 115KV to 230KV Overhead Transmission Lines
    Kempner, L., Jr.
    Haldar, A.
    ELECTRICAL TRANSMISSION AND SUBSTATION STRUCTURES 2015: TECHNICAL CHALLENGES AND INNOVATIVE SOLUTIONS IN GRID MODERNIZATION, 2015, : 178 - 189
  • [23] A new application concept of transmission line arresters to 500-kV lines
    Yamamoto, Y
    Hanada, T
    Omote, T
    Nakura, T
    Hayashi, T
    Fujita, H
    Irie, T
    1999 IEEE TRANSMISSION AND DISTRIBUTION CONFERENCE, VOLS 1 & 2, 1999, : 681 - 686
  • [24] 66/77kV transmission line arrester with new silicon rubber
    Kan, M
    IEEE/PES TRANSMISSION AND DISTRIBUTION CONFERENCE AND EXHIBITION 2002: ASIA PACIFIC, VOLS 1-3, CONFERENCE PROCEEDINGS: NEW WAVE OF T&D TECHNOLOGY FROM ASIA PACIFIC, 2002, : 645 - 646
  • [25] Modifying existing 138-kV transmission towers to 230-kV capacity
    Wood, Brian C.
    Moore, Timothy L.
    2005/2006 IEEE/PES TRANSMISSION & DISTRIBUTION CONFERENCE & EXPOSITION, VOLS 1-3, 2006, : 1139 - +
  • [26] Probabilistic Approach in Evaluation of Backflashover in 230kV Double Circuit Transmission Line
    Mohajeryami, Saeed
    Doostan, Milad
    2016 IEEE/PES TRANSMISSION AND DISTRIBUTION CONFERENCE AND EXPOSITION (T&D), 2016,
  • [27] A new approach to field upgrading
    Anon
    Hart's E and P, 2001, 74 (06):
  • [28] Effect of Line Splitting by New Substation on 500kV Transmission Line Compensated at One End
    Kusuma, Aristo Adi
    Pramana, Putu Agus Aditya
    Harsono, Brian Bramantyo S. D. A.
    Munir, Buyung Sofiarto
    2019 1ST INTERNATIONAL CONFERENCE ON CYBERNETICS AND INTELLIGENT SYSTEM (ICORIS), 2019, : 62 - 67
  • [29] Upgrading transmission line capability by AC-DC conversion
    Manickam, Raju
    Palaniappan, Subramaniam Nettiampalayam
    COMPUTERS & ELECTRICAL ENGINEERING, 2018, 68 : 616 - 628
  • [30] Research on Upgrading Plan of Transmission Line for Voltage Sag Treatment
    Xue Wang
    Changrong Liu
    Journal of Electrical Engineering & Technology, 2022, 17 : 1509 - 1516