Fuzzy TOPSIS method to primary crusher selection for Golegohar Iron Mine (Iran)

被引:16
|
作者
Rahimdel, Mohammad Javad [1 ]
Karamoozian, Mohammad [2 ]
机构
[1] Sahand Univ Technol, Dept Min Engn, Tabriz 513351996, Iran
[2] Shahrood Univ Technol, Fac Min Engn Petr & Geophys, Shahrood 3619995161, Iran
关键词
primary crusher; multi-criterion decision making (MCDM); technique for order performance by similarity to ideal solution; fuzzy set theory; Golegohar Iron Mine; gyratory crusher; DECISION-MAKING;
D O I
10.1007/s11771-014-2435-0
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
Selection of the crusher required a great deal of design regarding to the mine planning. Selection of suitable primary crusher from all of available primary crushers is a multi-criterion decision making (MCDM) problem. The present work explores the use of technique for order performance by similarity to ideal solution (TOPSIS) with fuzzy set theory to select best primary crusher for Golegohar Iron Mine in Iran. Gyratory, double toggle jaw, single toggle jaw, high speed roll crusher, low speed sizer, impact crusher, hammer mill and feeder breaker crushers have been considered as alternatives. Also, the capacity, feed size, product size, rock compressive strength, abrasion index and application of primary crusher for mobile plants were considered as criteria for solution of this MCDM problem. To determine the order of the alternatives, closeness coefficient is defined by calculating the distances to the fuzzy positive ideal solution (FPIS) and fuzzy negative ideal solution (FNIS). Results of our work based on fuzzy TOPSIS method show that the gyratory is the best primary crusher for the studied mine.
引用
收藏
页码:4352 / 4359
页数:8
相关论文
共 50 条
  • [1] Fuzzy TOPSIS method to primary crusher selection for Golegohar Iron Mine(Iran)
    Mohammad Javad Rahimdel
    Mohammad Karamoozian
    JournalofCentralSouthUniversity, 2014, 21 (11) : 4352 - 4359
  • [2] Fuzzy TOPSIS method to primary crusher selection for Golegohar Iron Mine (Iran)
    Mohammad Javad Rahimdel
    Mohammad Karamoozian
    Journal of Central South University, 2014, 21 : 4352 - 4359
  • [3] Design of controlled blasting (pre-splitting) in Golegohar iron ore mine, Iran
    Dindarloo, S. R.
    Askarnejad, N. -A.
    Ataei, M.
    TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2015, 124 (01): : 64 - 68
  • [4] A fuzzy TOPSIS method for robot selection
    Chu, T.-C. (mrchu@mail.stut.edu.tw), 1600, Springer-Verlag London Ltd (21):
  • [5] A fuzzy TOPSIS method for robot selection
    Chu, TC
    Lin, YC
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2003, 21 (04): : 284 - 290
  • [6] A Fuzzy TOPSIS Method for Robot Selection
    T.-C. Chu
    Y.-C. Lin
    The International Journal of Advanced Manufacturing Technology, 2003, 21 : 284 - 290
  • [7] Iron-Making Technology Selection Using a Fuzzy Hierarchical TOPSIS Method
    Towhidi, Nasser
    Tavakkoli-Moghaddam, Reza
    Peymandar, Mohammad
    JOURNAL OF IRON AND STEEL RESEARCH INTERNATIONAL, 2009, 16 : 1039 - 1044
  • [8] Using fuzzy TOPSIS method for mineral processing plant site selection Case study: Sangan iron ore mine (phase 2)
    Safari, Mohsen
    Kakaei, Reza
    Ataei, Mohammad
    Karamoozian, Mohammad
    ARABIAN JOURNAL OF GEOSCIENCES, 2012, 5 (05) : 1011 - 1019
  • [9] Causes of primary crusher conveyor tunnel failure in Sar Cheshmeh copper mine in Iran
    Toufigh, MM
    Mirabedini, ME
    MODERN TUNNELING SCIENCE AND TECHNOLOGY, VOLS I AND II, 2001, : 569 - 572
  • [10] Multifactor Personnel Selection by the Fuzzy TOPSIS Method
    Aliyeva, Kamala
    13TH INTERNATIONAL CONFERENCE ON THEORY AND APPLICATION OF FUZZY SYSTEMS AND SOFT COMPUTING - ICAFS-2018, 2019, 896 : 478 - 483