Bridge Responses Induced by Adjacent Subway Station Construction Using Shallow Tunneling Method

被引:15
|
作者
Su, Jie [1 ]
Fang, Qian [1 ]
Zhang, Dingli [1 ]
Niu, Xiaokai [2 ]
Liu, Xiang [1 ]
Jie, Yunming [1 ]
机构
[1] Beijing Jiaotong Univ, Key Lab Urban Underground Engn, Minist Educ, Beijing 100044, Peoples R China
[2] Beijing Municipal Engn Res Inst, Beijing 100037, Peoples R China
基金
中国国家自然科学基金;
关键词
PILE-GROUP; EXCAVATION; BUILDINGS; FAILURE; SHIELD;
D O I
10.1155/2018/8918749
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper presents a case of subway station construction under an existing prestressed concrete bridge with a three-span continuous beam located at the intersection of the 3rd Ring Road, Beijing. The Huayuan Subway Station of line 6, constructed crossing between #7 and the #8 piers of the bridge by the shallow tunneling method, is approximately perpendicular to the existing Huayuan Bridge. The minimum horizontal distance between the pile foundation and the subway station is only 0.08 m. The "Pile-Beam-Arc" construction sequence was used to ensure the safety of both the subway station and the bridge. Moreover, a series of reinforcement measures were adopted to safeguard the project, including deep grouting reinforcement surrounding the pile foundation from ground surface, temporary inverted arch in the middle of No. 5 drift, and the lateral steel support. Even though some cracks were observed on the bridge deck surface by the on-site deformation monitoring, the results were still within the proposed control standard. To prevent the further development of the cracks, jacking protection measure and bonded steel constructed under the box girder were performed. The related measures proposed in this research can provide useful references for future similar projects.
引用
收藏
页数:16
相关论文
共 50 条
  • [1] Comparison of shallow tunneling method with pile and rib method for construction of subway station in soft ground
    Sina AMIRI
    Ali Naghi DEHGHAN
    Frontiers of Structural and Civil Engineering, 2022, 16 (06) : 704 - 717
  • [2] Comparison of shallow tunneling method with pile and rib method for construction of subway station in soft ground
    Amiri, Sina
    Dehghan, Ali Naghi
    FRONTIERS OF STRUCTURAL AND CIVIL ENGINEERING, 2022, 16 (06) : 704 - 717
  • [3] Comparison of shallow tunneling method with pile and rib method for construction of subway station in soft ground
    Sina Amiri
    Ali Naghi Dehghan
    Frontiers of Structural and Civil Engineering, 2022, 16 : 704 - 717
  • [4] Analysis of effect on existing bridge piles induced by shallow tunneling construction of Beijing Subway
    Research Center of Tunneling and Underground Engineering, Beijing Jiaotong University, Beijing 100044, China
    Rock Soil Mech, 2006, SUPPL. (477-482):
  • [5] Shallow tunnelling method (STM) for subway station construction in soft ground
    Fang, Qian
    Zhang, Dingli
    Wong, Louis Ngai Yuen
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2012, 29 : 10 - 30
  • [6] A new decision method for construction scheme of shallow buried subway station
    Qiu, Daohong
    Yu, Yuehao
    Xue, Yiguo
    Su, Maoxin
    Zhou, Binghua
    Gong, Huimin
    Bai, Chenghao
    Fu, Kang
    GEOMECHANICS AND ENGINEERING, 2022, 30 (03) : 313 - 324
  • [7] Subway station construction using combined shield and shallow tunnelling method: Case study of Gaojiayuan station in Beijing
    Cao, Liqiang
    Fang, Qian
    Zhang, Dingli
    Chen, Tielin
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2018, 82 : 627 - 635
  • [8] Safety Risk Management of Huang Zhuang Subway Station Using Shallow Tunnel Construction Method
    Fang Qian
    Zhang Ding-li
    Li Bing
    Sun Feng
    EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 4184 - 4188
  • [9] Subway station construction ensuring safety of adjacent expressway
    Nishibayashi, M
    Nagashima, S
    TUNNELS AND METROPOLISES, VOLS 1 AND 2, 1998, : 1089 - 1094
  • [10] Review on Construction Method of Subway Station
    Li, Wei
    MATERIALS PROCESSING TECHNOLOGY, PTS 1-3, 2012, 418-420 : 2078 - 2081