摘要
The Higashi Roppongi Station of the subway, Nanboku Line (Subway No.7) currently under construction in the center of Tokyo is a large-section cut-and-cover tunnel station, This station is constructed in extreme proximity to a double-deck elevated expressway where the traffic volume is heavy. Diaphragm walls were constructed as advance underground supports in a transverse direction to the tunnel before the excavation work started. Furthermore, a special method rarely employed for subway construction, a large scale submerged excavation method, was employed to ensure the safety of the expressway and conservation of the surrounding environment. This paper is a report on this special construction method and the result of analysis, prediction, and measurement of the effect on the expressway structure during the work.
引用
收藏
页码:1089 / 1094
页数:6
相关论文
共 50 条
  • [1] Structure safety analysis on the adjacent masonry buildings before subway construction
    Qin, Dongping
    He, Ping
    Zhao, Yongzheng
    Li, Lu
    Zhongguo Tiedao Kexue/China Railway Science, 2012, 33 (04): : 45 - 51
  • [2] Measurement analysis of the influence of subway station construction to the adjacent building and ground surface deformation
    Song Jian
    Rong Xiaoyang
    Fan Yunyun
    ADVANCES IN ENVIRONMENTAL SCIENCE AND ENGINEERING, PTS 1-6, 2012, 518-523 : 4399 - 4404
  • [3] Bridge Responses Induced by Adjacent Subway Station Construction Using Shallow Tunneling Method
    Su, Jie
    Fang, Qian
    Zhang, Dingli
    Niu, Xiaokai
    Liu, Xiang
    Jie, Yunming
    ADVANCES IN CIVIL ENGINEERING, 2018, 2018
  • [4] Deformation Response and Safety Evaluation of Buildings Affected by Subway-Station Construction
    Feng, Chunlei
    Zhang, Dingli
    Wang, Hualao
    Zhang, Xuan
    ADVANCES IN CIVIL ENGINEERING, 2021, 2021
  • [5] Review on Construction Method of Subway Station
    Li, Wei
    MATERIALS PROCESSING TECHNOLOGY, PTS 1-3, 2012, 418-420 : 2078 - 2081
  • [6] Tandem Collaborative Control of Expressway Toll Station and Adjacent Intersection
    Yan, Nan
    Tan, Jingwen
    An, Wenjuan
    Gao, Jianping
    INTERNATIONAL JOURNAL OF MULTIPHYSICS, 2024, 18 (02)
  • [7] Early Warning of the Construction Safety Risk of a Subway Station Based on the LSSVM Optimized by QPSO
    Zhang, Leian
    Wang, Junwu
    Wu, Han
    Wu, Mengwei
    Guo, Jingyi
    Wang, Shengmin
    APPLIED SCIENCES-BASEL, 2022, 12 (11):
  • [8] The application of the LEED in subway station construction stage
    HaiZe, Pan
    Wei, Miao
    MengJie, Chen
    Jian, He
    Electronic Journal of Geotechnical Engineering, 2015, 20 (24): : 11945 - 11952
  • [9] Safety Analysis on the Structure of an Existing Metro Station Impacted by the Construction of an Adjacent Building
    Ma, Liheng
    Liang, Qinghuai
    Liu Yifan
    He Mingran
    INNOVATION IN CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE, 2012, 238 : 777 - 782
  • [10] Research on Station Management in Subway Operation Safety
    Li, Yiman
    2ND INTERNATIONAL CONFERENCE ON MATERIALS SCIENCE, RESOURCE AND ENVIRONMENTAL ENGINEERING (MSREE 2017), 2017, 1890