Bridge Responses Induced by Adjacent Subway Station Construction Using Shallow Tunneling Method

被引:15
|
作者
Su, Jie [1 ]
Fang, Qian [1 ]
Zhang, Dingli [1 ]
Niu, Xiaokai [2 ]
Liu, Xiang [1 ]
Jie, Yunming [1 ]
机构
[1] Beijing Jiaotong Univ, Key Lab Urban Underground Engn, Minist Educ, Beijing 100044, Peoples R China
[2] Beijing Municipal Engn Res Inst, Beijing 100037, Peoples R China
基金
中国国家自然科学基金;
关键词
PILE-GROUP; EXCAVATION; BUILDINGS; FAILURE; SHIELD;
D O I
10.1155/2018/8918749
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper presents a case of subway station construction under an existing prestressed concrete bridge with a three-span continuous beam located at the intersection of the 3rd Ring Road, Beijing. The Huayuan Subway Station of line 6, constructed crossing between #7 and the #8 piers of the bridge by the shallow tunneling method, is approximately perpendicular to the existing Huayuan Bridge. The minimum horizontal distance between the pile foundation and the subway station is only 0.08 m. The "Pile-Beam-Arc" construction sequence was used to ensure the safety of both the subway station and the bridge. Moreover, a series of reinforcement measures were adopted to safeguard the project, including deep grouting reinforcement surrounding the pile foundation from ground surface, temporary inverted arch in the middle of No. 5 drift, and the lateral steel support. Even though some cracks were observed on the bridge deck surface by the on-site deformation monitoring, the results were still within the proposed control standard. To prevent the further development of the cracks, jacking protection measure and bonded steel constructed under the box girder were performed. The related measures proposed in this research can provide useful references for future similar projects.
引用
收藏
页数:16
相关论文
共 50 条
  • [41] Research of Seismic Behavior of Subway Station Crossed by Bridge Based on Time History Analysis Method
    Peng, Bin
    Zhang, Nan
    Zhang, Qiang
    RAILWAY DEVELOPMENT, OPERATIONS, AND MAINTENANCE: PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON RAIL TRANSPORTATION 2017 (ICRT 2017), 2018, : 28 - 35
  • [42] Monitoring System for the Construction of Arch Cover Method Subway Station Based on DT and IoT
    Jiang, Hongren
    Jiang, Annan
    JOURNAL OF SENSORS, 2022, 2022
  • [43] Optimization Study of Subway Station Underground Excavation Construction Method Based on Fuzzy Theory
    Geng, Dongyang
    Yu, Xiangmei
    Cao, Lijun
    CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE II, PTS 1 AND 2, 2013, 438-439 : 1015 - 1019
  • [44] Ground Treatment and its Application in Shallow Subway Tunnel Crossing Urban River by Shield Tunneling Method
    Zhou Xiaojun
    ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 853 - 856
  • [45] Transfer Matrix Method for Calculating Displacement of Adjacent Buried Pipeline Caused by Subway Tunnel Construction
    Wang H.
    Jin H.
    Zhang J.
    He Y.
    Yan S.
    Tiedao Xuebao/Journal of the China Railway Society, 2019, 41 (10): : 93 - 98
  • [46] Surface settlement of subway station construction using pile-beam-arch approach
    Yu, Lin
    Zhang, Dingli
    Fang, Qian
    Cao, Liqiang
    Xu, Tong
    Li, Qianqian
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 90 : 340 - 356
  • [47] Construction techniques and support effect of large-diameter pipe roof for ultra-shallow buried subway station
    Zhang, Yu
    Zhao, Xu
    Guo, Fei
    Tao, Lianjin
    Liu, Jun
    Liao, Weizhang
    Tan, Lei
    Yang, Xiaohui
    KSCE JOURNAL OF CIVIL ENGINEERING, 2025, 29 (02)
  • [48] Numerical Simulation Analysis on Construction Process of Pile Method Pilot Tunnel of a Subway Station in Xi ' an
    Wang, Zhao-Jun
    Ren, Jian-Xi
    Chi-gan, Xiang-Ming
    Zhang, Liang
    Zhang, Yang
    2022 8TH INTERNATIONAL CONFERENCE ON HYDRAULIC AND CIVIL ENGINEERING: DEEP SPACE INTELLIGENT DEVELOPMENT AND UTILIZATION FORUM, ICHCE, 2022, : 664 - 667
  • [49] Identification and Gradation of Risk Sources in Subway Station Construction Based on Hole-pile Method
    Geng, Dongyang
    Cao, Lijun
    Yu, Xiangmei
    CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE II, PTS 1 AND 2, 2013, 438-439 : 1020 - 1023
  • [50] Dynamic Simulation Analysis of Large Space Subway Station Construction with Cavern-Pile Method
    Gong, Zhiqun
    Zhang, Fen
    Zhang, Yantao
    Gong, Yijun
    Gao, Dongbo
    ELECTRONIC JOURNAL OF GEOTECHNICAL ENGINEERING, 2019, 24 (05): : 1345 - 1361