共 50 条
- [41] Research of Seismic Behavior of Subway Station Crossed by Bridge Based on Time History Analysis Method RAILWAY DEVELOPMENT, OPERATIONS, AND MAINTENANCE: PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON RAIL TRANSPORTATION 2017 (ICRT 2017), 2018, : 28 - 35
- [43] Optimization Study of Subway Station Underground Excavation Construction Method Based on Fuzzy Theory CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE II, PTS 1 AND 2, 2013, 438-439 : 1015 - 1019
- [44] Ground Treatment and its Application in Shallow Subway Tunnel Crossing Urban River by Shield Tunneling Method ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 853 - 856
- [45] Transfer Matrix Method for Calculating Displacement of Adjacent Buried Pipeline Caused by Subway Tunnel Construction Tiedao Xuebao/Journal of the China Railway Society, 2019, 41 (10): : 93 - 98
- [48] Numerical Simulation Analysis on Construction Process of Pile Method Pilot Tunnel of a Subway Station in Xi ' an 2022 8TH INTERNATIONAL CONFERENCE ON HYDRAULIC AND CIVIL ENGINEERING: DEEP SPACE INTELLIGENT DEVELOPMENT AND UTILIZATION FORUM, ICHCE, 2022, : 664 - 667
- [49] Identification and Gradation of Risk Sources in Subway Station Construction Based on Hole-pile Method CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE II, PTS 1 AND 2, 2013, 438-439 : 1020 - 1023
- [50] Dynamic Simulation Analysis of Large Space Subway Station Construction with Cavern-Pile Method ELECTRONIC JOURNAL OF GEOTECHNICAL ENGINEERING, 2019, 24 (05): : 1345 - 1361