Variation Negotiation in PPP Toll-Road Projects: Option Approach

被引:3
|
作者
Nguyen, Tuan Anh [1 ]
Sun, Yuting [2 ]
机构
[1] Natl Univ Civil Engn, Dept Construct Econ, Hanoi 100000, Vietnam
[2] Univ New South Wales, Sch Civil & Environm Engn, Sydney, NSW 2052, Australia
关键词
Variation; Negotiation; Public-private partnerships (PPP); Real options analysis (ROA); PUBLIC-PRIVATE PARTNERSHIPS; INCOMPLETE CONTRACTS; CHANGE ORDERS; CONSTRUCTION PROJECTS; IMPACT; COST; CONCESSIONS; INFRASTRUCTURE; MANAGEMENT; OWNERSHIP;
D O I
10.1061/(ASCE)LA.1943-4170.0000495
中图分类号
D9 [法律]; DF [法律];
学科分类号
0301 ;
摘要
The literature on public-private partnership (PPP) agreements suggests that variation renegotiation places the public sector authority at a disadvantage, because the authority has to pay extra costs to claim its variation. This leads to the need for a PPP contract to incorporate flexibility, embedded with real options analysis (ROA), to deal with these variations. This paper proposes that PPP agreements should ideally contain an option for the authority to order variation as an effective response to changing circumstances in the postconstruction phase throughout the concession period of toll roads. Having the variation option, the authority sets a threshold on the concessionaire's bargaining power via variation negotiation as the authority can order its variation at its favorably controlled price. The paper also presents the ROA, based on the probabilistic cash flow approach, that gives the financial value of flexibility for the authority to order variation. This approach is straightforward and provides a fair way forward for the implementation of PPP toll roads. (C) 2021 American Society of Civil Engineers.
引用
收藏
页数:10
相关论文
共 50 条
  • [31] Modelling the effectiveness of PPP road infrastructure projects by applying random forests
    Rudzianskaite-Kvaraciejiene, Ruta
    Apanaviciene, Rasa
    Gelzinis, Adas
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2015, 21 (03) : 290 - 299
  • [32] Unit Costs of Public and PPP Road Projects: Evidence from India
    Meduri, Surya Sudheer
    Annamalai, Thillai Rajan
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (01) : 35 - 43
  • [33] An Approach to Prioritisation of Alternatives in Road Projects
    Podder, Subir Kumar
    INTERNATIONAL CONFERENCE ON TRANSPORTATION AND DEVELOPMENT 2021: TRANSPORTATION PLANNING AND DEVELOPMENT, 2021, : 91 - 100
  • [34] Navigating the road to success: unravelling the key factors influencing PPP selection in Indian road projects
    Bhatt, Sarthak
    Malek, Mohammedshakil
    Juremalani, Jayesh
    INTERNATIONAL JOURNAL OF INDIAN CULTURE AND BUSINESS MANAGEMENT, 2025, 34 (03)
  • [35] The role of good project governance in PPP project for toll road infrastructure in Indonesia
    Nusriadi, Laode
    Avianti, Ilya
    Tanzil, Nanny Dewi
    Parikesit, Danang
    JOURNAL OF INFRASTRUCTURE POLICY AND DEVELOPMENT, 2024, 8 (04)
  • [36] Understanding and Accommodating Risk and Uncertainty in Toll Road Projects A Review of the Literature
    Lemp, Jason D.
    Kockelman, Kara M.
    TRANSPORTATION RESEARCH RECORD, 2009, (2132) : 106 - 112
  • [37] Towards successful conditions for PFI in toll road projects: Indonesia case
    Pradono
    Ohmori, N
    Harata, N
    TRAFFIC AND TRANSPORTATION STUDIES, PROCEEDINGS, 2004, : 43 - 52
  • [38] A study on variation-specific disputes that arise in road projects in Sri Lanka: a qualitative approach
    Perera, B. A. K. S.
    Ekanayake, B. J.
    Jayalath, Chandana
    Jayathilaka, G. R. H.
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2021, 21 (06) : 571 - 581
  • [39] Measuring Success of PPP Transport Projects: A Cross-Case Analysis of Toll Roads
    Liyanage, Champika
    Villalba-Romero, Felix
    TRANSPORT REVIEWS, 2015, 35 (02) : 140 - 161
  • [40] Collusion prevention mechanism in PPP highway projects: Optimal government subsidy, toll and penalty
    Hou, Yueyi
    Wang, Hongwei
    Shi, Guanqun
    ECONOMICS OF TRANSPORTATION, 2025, 42