The role of good project governance in PPP project for toll road infrastructure in Indonesia

被引:0
|
作者
Nusriadi, Laode [1 ]
Avianti, Ilya [1 ]
Tanzil, Nanny Dewi [1 ]
Parikesit, Danang [2 ]
机构
[1] Padjadjaran State Univ, Bandung 45363, Jawa Barat, Indonesia
[2] Gadjah Mada Univ, Yogyakarta 55281, Daerah Istimewa, Indonesia
关键词
project intellectual capital; project ownership structure; good project governance; project performance; PUBLIC-PRIVATE PARTNERSHIPS; CORPORATE GOVERNANCE; PERFORMANCE; QUALITY; FIRM;
D O I
10.24294/jipd.v8i4.3259
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The use of infrastructure as a catalyst for Indonesia's economic growth faces significant challenges. One example is the construction projects, which have not reached the intended goal and have led to an increase in investment cost compared to the original plan. Additionally, the interaction between the government and companies involved in toll-road construction projects under the public-private partnerships (PPP) mechanism has yet to produce good quality project governance and expected project performance. This study aimed to find empirical data on the determination of project intellectual capital and project ownership structure through good project governance on toll-road project performance in Indonesia. This study adopted a quantitative approach that involved data collected through a survey conducted among toll-road projects from 2015 to 2019. The data was analyzed with Structural Equation Modeling Partial Least Square (SEM-PLS). The results showed that project intellectual capital and project ownership structure significantly affected good project governance. Good project governance Practices significantly affected project performance. Project intellectual capital and project ownership structure influenced project performance through the mediation of good project governance. Conversely, two hypotheses were not supported by the data, i.e., the effect of project intellectual capital and project ownership structure on project performance. The findings of this research contributed to the literature regarding the implementation of collaborative governance in PPPs toll road development projects in Indonesia by providing a framework and assessment tools, which could be valuable for researchers and policymakers in analyzing and evaluating the governance and performance of toll road construction PPP projects.
引用
收藏
页数:19
相关论文
共 50 条
  • [1] Developing Road Infrastructure Route Planning: Increasing Feasibility of Toll Road Project
    Berawi, Mohammed Ali
    Zagloel, Teuku Yuri
    Miraj, Perdana
    Berawi, AbdurRohim Boy
    Titaheluw, Wellsi
    Bin Abd Karim, Saipol Bari
    MAKARA JOURNAL OF TECHNOLOGY, 2016, 20 (03): : 147 - 152
  • [2] A Comparative Review of Quantitative VFM Methodology for PPP Infrastructure Project in Indonesia and Australia
    Pangeran, Moch Husnullah
    Pribadi, Krishna Suryanto
    Susilawati, Connie
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1-3, 2010, : 290 - 295
  • [3] Project performance in a toll road infrastructure with a public-private partnership scheme
    Nusriadi, Laode
    Avianti, Ilya
    Tanzil, Nanny Dewi
    Parikesit, Danang
    ECONOMIC ANNALS-XXI, 2021, 193 (9-10): : 114 - 120
  • [4] Discussion on Project Governance of PPP Construction
    Li, Weili
    Xun, Zhiyuan
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1-3, 2010, : 768 - 771
  • [5] Single Treatment of PPP Road Project Options
    Carmichael, David G.
    Tuan Anh Nguyen
    Shen, Xuesong
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2019, 145 (02)
  • [6] Risk perception in PPP infrastructure project financing in India
    Gupta, Pankaj Kumar
    Verma, Harender
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2020, 25 (03) : 347 - 369
  • [7] GOVERNANCE CHALLENGES IN PROMOTING TOLL ROAD PROJECTS: A CASE OF INDONESIA
    Parikesit, Danang
    Black, John
    GEOTECHNICAL ENGINEERING FOR DISASTER MITIGATION AND REHABILITATION 2011/GEOTECHNICAL AND HIGHWAY ENGINEERING - PRACTICAL APPLICATIONS, CHALLENGES AND OPPORTUNITIES, 2011, : 208 - 215
  • [8] Implementing Toll Road Infrastructure Financing in Indonesia: Critical Success Factors from the Perspective of Toll Road Companies
    Fauzan, Muhammad
    Kuswanto, Heri
    Utomo, Christiono
    INTERNATIONAL JOURNAL OF FINANCIAL STUDIES, 2023, 11 (04):
  • [9] Deficiencies in Project Governance: An Analysis of Infrastructure Development Program
    Khan, Asadullah
    Waris, Muhammad
    Ismail, Ishak
    Sajid, Mirza Rizwan
    Ullah, Mehfooz
    Usman, Faisal
    ADMINISTRATIVE SCIENCES, 2019, 9 (01):
  • [10] Improving the Performance of Public Sector Infrastructure Projects: Role of Project Governance and Stakeholder Management
    Khan, Asadullah
    Waris, Muhammad
    Panigrahi, Shrikant
    Sajid, Mirza Rizwan
    Rana, Faisal
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2021, 37 (02)