The role of good project governance in PPP project for toll road infrastructure in Indonesia

被引:0
|
作者
Nusriadi, Laode [1 ]
Avianti, Ilya [1 ]
Tanzil, Nanny Dewi [1 ]
Parikesit, Danang [2 ]
机构
[1] Padjadjaran State Univ, Bandung 45363, Jawa Barat, Indonesia
[2] Gadjah Mada Univ, Yogyakarta 55281, Daerah Istimewa, Indonesia
关键词
project intellectual capital; project ownership structure; good project governance; project performance; PUBLIC-PRIVATE PARTNERSHIPS; CORPORATE GOVERNANCE; PERFORMANCE; QUALITY; FIRM;
D O I
10.24294/jipd.v8i4.3259
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The use of infrastructure as a catalyst for Indonesia's economic growth faces significant challenges. One example is the construction projects, which have not reached the intended goal and have led to an increase in investment cost compared to the original plan. Additionally, the interaction between the government and companies involved in toll-road construction projects under the public-private partnerships (PPP) mechanism has yet to produce good quality project governance and expected project performance. This study aimed to find empirical data on the determination of project intellectual capital and project ownership structure through good project governance on toll-road project performance in Indonesia. This study adopted a quantitative approach that involved data collected through a survey conducted among toll-road projects from 2015 to 2019. The data was analyzed with Structural Equation Modeling Partial Least Square (SEM-PLS). The results showed that project intellectual capital and project ownership structure significantly affected good project governance. Good project governance Practices significantly affected project performance. Project intellectual capital and project ownership structure influenced project performance through the mediation of good project governance. Conversely, two hypotheses were not supported by the data, i.e., the effect of project intellectual capital and project ownership structure on project performance. The findings of this research contributed to the literature regarding the implementation of collaborative governance in PPPs toll road development projects in Indonesia by providing a framework and assessment tools, which could be valuable for researchers and policymakers in analyzing and evaluating the governance and performance of toll road construction PPP projects.
引用
收藏
页数:19
相关论文
共 50 条
  • [31] Emission Inventory of HC and CO of Heavy Construction Equipment by Using NONROAD Engine Modelling for Toll Road Project in Indonesia
    Hajji, Apif M.
    Supriyanto, Bambang
    Larasati, Aisyah
    INTERNATIONAL CONFERENCE ON SCIENCE AND APPLIED SCIENCE (ICSAS2020), 2020, 2296
  • [32] Impact of governance on project delivery of complex NHS PFI/PPP schemes
    Patel, Manju
    Robinson, Herbert
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2010, 15 (03) : 216 - +
  • [33] Capturing the Flexibility Value of Infrastructure: A Case Example of a Road Project
    Tuan Anh Nguyen
    Nhu Phien Nguyen
    CIGOS 2021, EMERGING TECHNOLOGIES AND APPLICATIONS FOR GREEN INFRASTRUCTURE, 2022, 203 : 1495 - 1503
  • [34] Assessing the effect of IT infrastructure on project success in the financial sector: The role of project flexibility
    Al-Zagheer, Hanady
    AL-Obaidly, Ghoson Abdulaziz
    AL Freijat, Saleh Yahya
    Akhurshaidah, Sara Abd Elhakim Oqlah
    Al-Manaseer, Sufian Radwan
    JOURNAL OF PROJECT MANAGEMENT, 2024, 9 (04) : 337 - 344
  • [35] Infrastructure Enabling Faster Adoption of Good Practices: The BoaVista Project
    Goncalves, Raphael T.
    Velasco, Jefferson L.
    PROCEEDINGS OF THE 15TH INTERNATIONAL CONFERENCE ON THEORY AND PRACTICE OF ELECTRONIC GOVERNANCE, ICEGOV 2022, 2022, : 562 - 565
  • [36] Risk analysis of toll road KPS project with SSM (Soft System Methodology) at Gempol - Banyuwangi toll road
    Suranata, P. G.
    Wahyuni, P., I
    Triswandana, I. W. G. E.
    5TH ANNUAL APPLIED SCIENCE AND ENGINEERING CONFERENCE (AASEC 2020), 2021, 1098
  • [37] Toll Road PPP Project Risk Early Warning Based on Variable Weight Extension Matter-element and Evidence Theoies
    Pan Y.
    Mao T.-F.
    Jiaotong Yunshu Xitong Gongcheng Yu Xinxi/Journal of Transportation Systems Engineering and Information Technology, 2018, 18 (05): : 5 - 11
  • [38] Analysis of road capacity and franchise price decision delegation in toll road BOT project
    Chen, Zhiyuan
    Ye, Hanrui
    Liu, Bingxi
    Xue, Weili
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2021, 146
  • [39] Governance, governmentality and project performance: the role of sovereignty
    Mueller, Ralf
    IJISPM-INTERNATIONAL JOURNAL OF INFORMATION SYSTEMS AND PROJECT MANAGEMENT, 2019, 7 (02): : 5 - 17
  • [40] The effects of governance on performance: the case of Public-Private Partnership (PPP) toll roads in Indonesia
    Winata, Lufta Erwin
    Gultom, Yohanna M. L.
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (13) : 1398 - 1406