The effects of governance on performance: the case of Public-Private Partnership (PPP) toll roads in Indonesia

被引:4
|
作者
Winata, Lufta Erwin [1 ]
Gultom, Yohanna M. L. [2 ]
机构
[1] Enterprise Risk Management Dept, Risk Management Div, Jakarta, Indonesia
[2] Univ Indonesia, Fac Econ & Business, Dept Econ, Inst Econ & Governance Res Cluster, Depok, Indonesia
关键词
PPP; contract model; governance; institution; transaction cost; principal-agent; project performance; BOT; SBOT; DBFOM; BOT PROJECTS; IMPLEMENTATION; INCENTIVES; SUCCESS; MODEL;
D O I
10.1080/15623599.2023.2219937
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This article examines how contract model selection shapes PPP governance, which may affect the construction performance of PPP Toll Roads in Indonesia. This study compares the performance of PPP contracts used to build the 49 toll road projects, i.e. the Build-Operate-Transfer (BOT), Supported BOT (SBOT) and Design-Build-Finance-Operate-Maintenance (DBFOM) contracts. Using an Instrumental Variable Two-Stage Least Squares Regression (IV-2SLS) approach, this study discovers that SBOT contracts have lower costs and shorter completion times than BOT contracts due to a better incentive structure, which includes not only various government supports but also stronger control mechanisms in preparation, monitoring and audit. Meanwhile, using an OLS regression, DBFOM contracts have lower costs and shorter completion times than BOT contracts because private firms were able to better internalize externalities and perform better design and monitoring because they were in charge of the planning from the beginning. These findings suggest that the choice of contract has significant effects on the construction performance of PPP and transaction cost minimization is one of the keys to consider in the selection of PPP contract governance, especially to anticipate cost overrun and time delay risks.
引用
收藏
页码:1398 / 1406
页数:9
相关论文
共 50 条
  • [1] Assessment of the government's role performance in public-private partnership (PPP) toll road projects in Indonesia
    Rohman, Mohammad Arif
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2022, 27 (02) : 239 - 258
  • [2] Evaluating Public-Private Partnership Organizational Alternatives for Existing Toll Roads
    Ahmadjian, Christopher J.
    Collura, John
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2012, 28 (02) : 114 - 119
  • [3] Public-Private Partnership (PPP) in Smart Education: The Case of Ghana
    Raphael, Nimako
    Yang Xi
    PROCEEDINGS OF 2017 INTERNATIONAL CONFERENCE ON PUBLIC ADMINISTRATION (12TH) & INTERNATIONAL SYMPOSIUM ON WEST AFRICAN STUDIES (1ST), VOL II, 2017, : 256 - 263
  • [4] Public-Private Partnership for Good Governance
    Mukhopadhyay, Asok Kumar
    PROCEEDINGS OF 2012 INTERNATIONAL CONFERENCE ON PUBLIC ADMINISTRATION (8TH), VOL I, 2012, : 829 - 838
  • [5] The Governance Pattern of Public-Private Partnership
    Lv Xiao-li
    Lv Mao-lin
    Liang Xiao
    PROCEEDINGS OF 2017 INTERNATIONAL CONFERENCE ON PUBLIC ADMINISTRATION (12TH) & INTERNATIONAL SYMPOSIUM ON WEST AFRICAN STUDIES (1ST), VOL II, 2017, : 493 - 498
  • [6] Public-private partnership (PPP) in agriculture development
    Rao, P. K. Ananda
    INDIAN JOURNAL OF GENETICS AND PLANT BREEDING, 2011, 71 (02) : 202 - 203
  • [7] The Governance Pattern of Public-Private Partnership in Global Governance
    Lyu Xiaoli
    Liang Xiao
    International Understanding, 2017, (02) : 21 - 27
  • [8] The effects of contractual and relational governance on public-private partnership sustainability
    Li, Juankun
    Liu, Bingsheng
    Wang, Dan
    Casady, Carter B.
    PUBLIC ADMINISTRATION, 2024, 102 (04) : 1418 - 1449
  • [9] Efficiency Assessment of Public-Private Partnership (PPP) Projects: The Case of Russia
    Berezin, Andrey
    Sergi, Bruno S.
    Gorodnova, Natalia
    SUSTAINABILITY, 2018, 10 (10)
  • [10] Project performance in a toll road infrastructure with a public-private partnership scheme
    Nusriadi, Laode
    Avianti, Ilya
    Tanzil, Nanny Dewi
    Parikesit, Danang
    ECONOMIC ANNALS-XXI, 2021, 193 (9-10): : 114 - 120