共 50 条
- [44] Scheduling in aerospace composite manufacturing systems: a two-stage hybrid flow shop problem The International Journal of Advanced Manufacturing Technology, 2018, 95 : 3259 - 3274
- [46] Scheduling in aerospace composite manufacturing systems: a two-stage hybrid flow shop problem INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2018, 95 (9-12): : 3259 - 3274
- [47] Scheduling in aerospace composite manufacturing systems: a two-stage hybrid flow shop problem Demirli, Kudret (kudret.demirli@concordia.ca), 1600, Springer London (95): : 9 - 12
- [48] Scheduling a Two Stage Proportionate Flexible Flow Shop with Dedicated Machines and No Buffers OPERATIONS RESEARCH PROCEEDINGS 2021, 2022, : 353 - 358
- [49] Two-stage flow-shop scheduling problem with non-identical second stage assembly machines The International Journal of Advanced Manufacturing Technology, 2013, 69 : 2215 - 2226
- [50] Two-stage flow-shop scheduling problem with non-identical second stage assembly machines INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 69 (9-12): : 2215 - 2226