Scheduling in aerospace composite manufacturing systems: a two-stage hybrid flow shop problem

被引:16
|
作者
Azami, Aria [1 ]
Demirli, Kudret [1 ,2 ]
Bhuiyan, Nadia [1 ]
机构
[1] Concordia Univ, Dept Mech & Ind Engn, Montreal, PQ H3G 1M8, Canada
[2] Khalifa Univ, Dept Ind & Syst Engn, Abu Dhabi 127788, U Arab Emirates
基金
加拿大自然科学与工程研究理事会;
关键词
Job scheduling; Hybrid flow shop; Mixed integer linear programming; Genetic algorithm; Aerospace composite manufacturing systems; GENETIC-ALGORITHM; SETUP TIME; BOUND ALGORITHM; LIMITED BUFFER; BATCH; CLASSIFICATION; PROCESSORS; MACHINES; FAMILIES; LINES;
D O I
10.1007/s00170-017-1429-0
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This research investigates a real-world complex two-stage hybrid flow shop scheduling problem which is faced during the manufacturing of composite aerospace components. There are a number of new constraints to be taken into account in this special hybrid flow shop, in particular limited physical capacity of the intermediate buffer, limited waiting time between processing stages, and limited tools/molds used in both stages in each production cycle. We propose a discrete-time mixed integer linear programming model with an underlying branch and bound algorithm, to solve small- and medium-size problems (up to 100 jobs). To solve the large instances of the problem (up to 300 jobs), a genetic algorithm with a novel crossover operator is developed. A new heuristic method is introduced to generate the initial population of the genetic algorithm. The results show the high level of computational efficiency and accuracy of the proposed genetic algorithm when compared to the optimal solutions obtained from the mathematical model. The results also show that the proposed genetic algorithm outperforms the conventional dispatching rules (i.e., shortest processing time, earliest dues date and longest processing time) when applied to large-size problems. A real case study undertaken at one of the leading aerospace companies in Canada is used to formulate the model, collect data for the parameters of the model, and analyze the results.
引用
收藏
页码:3259 / 3274
页数:16
相关论文
共 50 条
  • [1] Scheduling in aerospace composite manufacturing systems: a two-stage hybrid flow shop problem
    Demirli, Kudret (kudret.demirli@concordia.ca), 1600, Springer London (95): : 9 - 12
  • [2] Scheduling in aerospace composite manufacturing systems: a two-stage hybrid flow shop problem
    Aria Azami
    Kudret Demirli
    Nadia Bhuiyan
    The International Journal of Advanced Manufacturing Technology, 2018, 95 : 3259 - 3274
  • [3] Minimizing makespan in a two-stage hybrid flow shop scheduling problem with open shop in one stage
    Dong Jian-ming
    Hu Jue-liang
    Chen Yong
    APPLIED MATHEMATICS-A JOURNAL OF CHINESE UNIVERSITIES SERIES B, 2013, 28 (03) : 358 - 368
  • [4] Minimizing makespan in a two-stage hybrid flow shop scheduling problem with open shop in one stage
    DONG Jianming
    HU Jueliang
    CHEN Yong
    Applied Mathematics:A Journal of Chinese Universities(Series B), 2013, 28 (03) : 358 - 368
  • [5] Minimizing makespan in a two-stage hybrid flow shop scheduling problem with open shop in one stage
    Jian-ming Dong
    Jue-liang Hu
    Yong Chen
    Applied Mathematics-A Journal of Chinese Universities, 2013, 28 : 358 - 368
  • [6] Distributed two-stage hybrid flow shop scheduling
    Zhang Q.
    Sun Z.
    Lei D.
    Huazhong Keji Daxue Xuebao (Ziran Kexue Ban)/Journal of Huazhong University of Science and Technology (Natural Science Edition), 2020, 48 (04): : 127 - 132
  • [7] Optimal scheduling of a two-stage hybrid flow shop
    Haouari, Mohamed
    Hidri, Lotfi
    Gharbi, Anis
    MATHEMATICAL METHODS OF OPERATIONS RESEARCH, 2006, 64 (01) : 107 - 124
  • [8] Optimal Scheduling of a Two-stage Hybrid Flow Shop
    Mohamed Haouari
    Lotfi Hidri
    Anis Gharbi
    Mathematical Methods of Operations Research, 2006, 64 : 107 - 124
  • [9] A genetic algorithm for two-stage no-wait hybrid flow shop scheduling problem
    Wang, Shijin
    Liu, Ming
    COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (04) : 1064 - 1075
  • [10] A two-stage flow shop scheduling problem with transportation considerations
    Chikhi, Nacira
    Abbas, Moncef
    Benmansour, Rachid
    Bekrar, Abdelghani
    Hanafi, Said
    4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2015, 13 (04): : 381 - 402