Resource dedication problem in a multi-project environment

被引:32
|
作者
Besikci, Umut [1 ]
Bilge, Umit [1 ]
Ulusoy, Gunduz [2 ]
机构
[1] Bogazici Univ, Istanbul, Turkey
[2] Sabanci Univ, Istanbul, Turkey
关键词
Multi-project scheduling; Resource dedication problem; Resource preference; Lagrangian relaxation; MRCPSP; SCHEDULING PROBLEM; GENETIC ALGORITHM; LIMITED RESOURCES; MODES; HEURISTICS; COSTS;
D O I
10.1007/s10696-012-9140-9
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
There can be different approaches to the management of resources within the context of multi-project scheduling problems. In general, approaches to multi-project scheduling problems consider the resources as a pool shared by all projects. On the other hand, when projects are distributed geographically or sharing resources between projects is not preferred, then this resource sharing policy may not be feasible. In such cases, the resources must be dedicated to individual projects throughout the project durations. This multi-project problem environment is defined here as the resource dedication problem (RDP). RDP is defined as the optimal dedication of resource capacities to different projects within the overall limits of the resources and with the objective of minimizing a predetermined objective function. The projects involved are multi-mode resource constrained project scheduling problems with finish to start zero time lag and non-preemptive activities and limited renewable and nonrenewable resources. Here, the characterization of RDP, its mathematical formulation and two different solution methodologies are presented. The first solution approach is a genetic algorithm employing a new improvement move called combinatorial auction for RDP, which is based on preferences of projects for resources. Two different methods for calculating the projects' preferences based on linear and Lagrangian relaxation are proposed. The second solution approach is a Lagrangian relaxation based heuristic employing subgradient optimization. Numerical studies demonstrate that the proposed approaches are powerful methods for solving this problem.
引用
收藏
页码:206 / 229
页数:24
相关论文
共 50 条
  • [1] Resource dedication problem in a multi-project environment
    Umut Beşikci
    Ümit Bilge
    Gündüz Ulusoy
    Flexible Services and Manufacturing Journal, 2013, 25 : 206 - 229
  • [2] A robust multi-project scheduling problem under a resource dedication-transfer policy
    Zhao, Yan
    Hu, Xuejun
    Wang, Jianjiang
    Cui, Nanfang
    ANNALS OF OPERATIONS RESEARCH, 2024, 337 (01) : 425 - 457
  • [3] A community detection approach for the resource leveling problem in a multi-project scheduling environment
    Sayyadi, Abbas
    Esmaeeli, Hamid
    Hossein, Amir
    COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 169
  • [4] Multi-project scheduling in a construction environment with resource constraints
    Stephenson, P
    Ying, Y
    SYSTEM-BASED VISION FOR STRATEGIC AND CREATIVE DESIGN, VOLS 1-3, 2003, : 2251 - 2255
  • [5] Resource Constrained Multi-Project Scheduling Problem with Resource Transfer Times
    Suresh, M.
    Dutta, Pankaj
    Jain, Karuna
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2015, 32 (06)
  • [6] Multi-mode resource constrained multi-project scheduling and resource portfolio problem
    Besikci, Umut
    Bilge, Umit
    Ulusoy, Gunduz
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 240 (01) : 22 - 31
  • [7] A Combination of Different Resource Management Policies in a Multi-Project Environment
    Besikci, Umut
    Ulusoy, Gunduz
    Bilge, Umit
    PROCEEDINGS OF 2013 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IEEE-IESM 2013), 2013, : 864 - 869
  • [8] Resource-constrained multi-project scheduling problem: A survey
    Gomez Sanchez, Mariam
    Lalla-Ruiz, Eduardo
    Gil, Alejandro Fernandez
    Castro, Carlos
    Voss, Stefan
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 309 (03) : 958 - 976
  • [9] A genetic algorithm for the resource constrained multi-project scheduling problem
    Goncalves, J. F.
    Mendes, J. J. M.
    Resende, M. G. C.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 189 (03) : 1171 - 1190
  • [10] HEURISTIC FRAMEWORK FOR THE RESOURCE CONSTRAINED MULTI-PROJECT SCHEDULING PROBLEM
    KIM, SO
    SCHNIEDERJANS, MJ
    COMPUTERS & OPERATIONS RESEARCH, 1989, 16 (06) : 541 - 556