In the complex and dynamic wafer fab manufacturing environment, cycle-time reduction is a key performance indicator that is always being placed on high focus. Cycle-time improvement project sometimes focuses on straight-forward and obvious KPI such as tool availability, manning ratio, dispatching rules, etc. However, a project can discover other opportunities to improve the cycle-time/ productivity when the project driver makes data-driven decision instead of heuristic decision. This paper outlines the journey of a Lean Six Sigma project aimed at cycle-time reduction that was formulated and launched by the Fab Production Control (PC) team. After the solution was fully implemented, a capacity gain of similar to 4% and a cycle-time improvement of similar to 36% is achieved from the identified tool type.
引用
收藏
页数:4
相关论文
共 50 条
  • [41] Barriers in green lean six sigma product development process: an ISM approach
    Kumar, Sanjay
    Luthra, Sunil
    Govindan, Kannan
    Kumar, Naveen
    Haleem, Abid
    PRODUCTION PLANNING & CONTROL, 2016, 27 (7-8) : 604 - 620
  • [42] Prediction and improvement of iron casting quality through analytics and Six Sigma approach
    Mishra, Nandkumar
    Rane, Santosh B.
    INTERNATIONAL JOURNAL OF LEAN SIX SIGMA, 2019, 10 (01) : 189 - 210
  • [43] Reduction of paint line defects in shock absorber through Six Sigma DMAIC phases
    Srinivasan, K.
    Muthu, S.
    Prasad, N. K.
    Satheesh, G.
    12TH GLOBAL CONGRESS ON MANUFACTURING AND MANAGEMENT (GCMM - 2014), 2014, 97 : 1755 - 1764
  • [44] Implementing Lean Six Sigma in a multispecialty hospital through a change management approach
    Samanta, Alok Kumar
    Varaprasad, G.
    Gurumurthy, Anand
    Antony, Jiju
    TQM JOURNAL, 2024, 36 (08): : 2281 - 2296
  • [45] Improvement of claim processing cycle time through Lean Six Sigma methodology
    Sarkar, Shri Ashok
    Mukhopadhyay, Arup Ranjan
    Ghosh, Sadhan Kumar
    INTERNATIONAL JOURNAL OF LEAN SIX SIGMA, 2013, 4 (02) : 171 - 183
  • [46] Process integration of single-wafer technology in a 300-mm fab, realizing drastic cycle time reduction with high yield and excellent reliability
    Ikeda, S
    Nemoto, K
    Funabashi, M
    Uchino, T
    Yamamoto, H
    Yabuoshi, N
    Sasaki, Y
    Komori, K
    Suzuki, N
    Nishihara, S
    Sasabe, S
    Koike, A
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2003, 16 (02) : 102 - 110
  • [47] Patient Discharge Time Improvement by Using the Six Sigma Approach: A Case Study
    El-Banna, Mahmoud
    QUALITY ENGINEERING, 2013, 25 (04) : 401 - 417
  • [48] Six Sigma Approach to Reduce Door-to-Balloon Time for Patients With STEMI
    Sharma, Tushar
    Chaudhary, Rohit
    Garg, Jalaj
    Kondur, Ashok
    Mohananey, Divyanshu
    Chaudhary, Rahul
    AMERICAN JOURNAL OF MANAGED CARE, 2020, 26 (05): : E140 - E141
  • [49] CONTROL OF THE VARIABILITY OF THE BIOFUEL PACKAGING PROCESS THROUGH THE SIX SIGMA METHODOLOGY: A CASE STUDY
    Campos Pianno, Rafael Francisco
    Achcar, Jorge Alberto
    Junior, Walther Azzolini
    INDEPENDENT JOURNAL OF MANAGEMENT & PRODUCTION, 2020, 11 (06): : 2009 - 2031
  • [50] Process improvement through Six Sigma with Beta correction: a case study of manufacturing company
    Gijo, E. V.
    Scaria, Johny
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 71 (1-4): : 717 - 730