Queue Time Reduction in Wafer Fab Process through Six Sigma Approach

被引:0
|
作者
Kerk, Eric [1 ]
Chan, Chih Ming [1 ]
机构
[1] GLOBALFOUNDRIES PTE LTD, 60 Woodlands Ind Pk D St 2, Singapore 738406, Singapore
关键词
Lean and Six Sigma; Continuous Improvement;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In the complex and dynamic wafer fab manufacturing environment, cycle-time reduction is a key performance indicator that is always being placed on high focus. Cycle-time improvement project sometimes focuses on straight-forward and obvious KPI such as tool availability, manning ratio, dispatching rules, etc. However, a project can discover other opportunities to improve the cycle-time/ productivity when the project driver makes data-driven decision instead of heuristic decision. This paper outlines the journey of a Lean Six Sigma project aimed at cycle-time reduction that was formulated and launched by the Fab Production Control (PC) team. After the solution was fully implemented, a capacity gain of similar to 4% and a cycle-time improvement of similar to 36% is achieved from the identified tool type.
引用
收藏
页数:4
相关论文
共 50 条
  • [21] Improving Sigma Level of Galvanization Process by Zinc Over-Coating Reduction Using an Integrated Six Sigma and Design-of-Experiments Approach
    Verma, Neha
    Sharma, Vinay
    Badar, M. Affan
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2022, 47 (07) : 8535 - 8549
  • [22] Improving Sigma Level of Galvanization Process by Zinc Over-Coating Reduction Using an Integrated Six Sigma and Design-of-Experiments Approach
    Neha Verma
    Vinay Sharma
    M. Affan Badar
    Arabian Journal for Science and Engineering, 2022, 47 : 8535 - 8549
  • [23] A Hybrid SOM-BPN Approach to Lot Output Time Prediction in a Wafer Fab
    Toly Chen
    Neural Processing Letters, 2006, 24 : 271 - 288
  • [25] Simultaneous cycle-time reduction and output enhancement in a fully loaded foundry wafer fab
    Ho, CM
    Chen, TC
    Hseih, P
    Chu, C
    Houn, E
    Su, KJ
    Wang, PM
    Yew, WC
    Sun, SW
    ISSM 2000: NINTH INTERNATIONAL SYMPOSIUM ON SEMICONDUCTOR MANUFACTURING, PROCEEDINGS, 2000, : 63 - 66
  • [26] Autoverification process improvement by Six Sigma approach: Clinical chemistry & immunoassay
    Randell, Edward W.
    Short, Garry
    Lee, Natasha
    Beresford, Allison
    Spencer, Margaret
    Kennell, Marina
    Moores, Zoe
    Parry, David
    CLINICAL BIOCHEMISTRY, 2018, 55 : 42 - 48
  • [27] Six Sigma Approach to Enhance Concurrency of the Procurement Process for Raw Materials
    Kochov, Atanas
    Argilovski, Aleksandar
    TEHNICKI GLASNIK-TECHNICAL JOURNAL, 2021, 15 (04): : 510 - 517
  • [28] Blending Six Sigma and CMMI - An Approach to Accelerate Process Improvement in SMEs
    Habib, Maria
    Ahmed, Sana
    Rehmat, Amna
    Khan, Malik Jahan
    Shamail, Shafay
    INMIC: 2008 INTERNATIONAL MULTITOPIC CONFERENCE, 2008, : 386 - 391
  • [29] A Six Sigma and DMAIC application for the reduction of defects in a rubber gloves manufacturing process
    Jirasukprasert, Ploytip
    Garza-Reyes, Jose Arturo
    Kumar, Vikas
    Lim, Ming K.
    INTERNATIONAL JOURNAL OF LEAN SIX SIGMA, 2014, 5 (01) : 2 - 21
  • [30] A SIX SIGMA AND SYSTEM DYNAMIC INTEGRATION FOR PROCESS VARIABILITY REDUCTION IN INDUSTRIAL PROCESSES
    Diaz-Ruiz, Gonzalo
    Trujillo-Gallego, Mariana
    INTERNATIONAL JOURNAL FOR QUALITY RESEARCH, 2022, 16 (04) : 1149 - 1178