An integrated scheduling and control model for multi-mode projects

被引:8
|
作者
Hazir, Oncu [1 ]
Schmidt, Klaus Werner [2 ]
机构
[1] Cankaya Univ, Dept Ind Engn, Ankara, Turkey
[2] Cankaya Univ, Dept Mechatron Engn, Ankara, Turkey
关键词
Project scheduling; Project control; Optimal control theory; COST TRADEOFF PROBLEM; OPTIMIZATION; NETWORK; MEMORY;
D O I
10.1007/s10696-012-9138-3
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In today's highly competitive uncertain project environments, it is of crucial importance to develop analytical models and algorithms to schedule and control project activities so that the deviations from the project objectives are minimized. This paper addresses the integrated scheduling and control in multi-mode project environments. We propose an optimization model that models the dynamic behavior of projects and integrates optimal control into a practically relevant project scheduling problem. From the scheduling perspective, we address the discrete time/cost trade-off problem, whereas an optimal control formulation is used to capture the effect of project control. Moreover, we develop a solution algorithm for two particular instances of the optimal project control. This algorithm combines a tabu search strategy and nonlinear programming. It is applied to a large scale test bed and its efficiency is tested by means of computational experiments. To the best of our knowledge, this research is the first application of optimal control theory to multi-mode project networks. The models and algorithms developed in this research are targeted as a support tool for project managers in both scheduling and deciding on the timing and quantity of control activities.
引用
收藏
页码:230 / 254
页数:25
相关论文
共 50 条
  • [31] Multiprocessor Scheduling of a Multi-Mode Dataflow Graph Considering Mode Transition Delay
    Jung, Hanwoong
    Oh, Hyunok
    Ha, Soonhoi
    ACM TRANSACTIONS ON DESIGN AUTOMATION OF ELECTRONIC SYSTEMS, 2017, 22 (02)
  • [32] A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags
    Majid Sabzehparvar
    S. Mohammad Seyed-Hosseini
    The Journal of Supercomputing, 2008, 44 : 257 - 273
  • [33] Continuous-time formulations for multi-mode project scheduling
    Sayah, David
    COMPUTERS & OPERATIONS RESEARCH, 2023, 152
  • [34] Optimal Scheduling for Constant-Rate Multi-Mode Systems
    Alur, Rajeev
    Trivedi, Ashutosh
    Wojtczak, Dominik
    HSCC 12: PROCEEDINGS OF THE 15TH ACM INTERNATIONAL CONFERENCE ON HYBRID SYSTEMS: COMPUTATION AND CONTROL, 2012, : 75 - 84
  • [35] Adaptive policies for multi-mode project scheduling under uncertainty
    Godinho, Pedro
    Branco, Fernando G.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 216 (03) : 553 - 562
  • [36] Performance of the MIMO downlink channel with multi-mode adaptation and scheduling
    Forenza, A
    Airy, M
    Kountouris, M
    Heath, RW
    Gesbert, D
    Shakkottai, S
    2005 IEEE 6TH WORKSHOP ON SIGNAL PROCESSING ADVANCES IN WIRELESS COMMUNICATIONS, 2005, : 695 - 699
  • [37] Multi-Mode Project Scheduling with Limited Resource and Budget Constraints
    Sultana, Babe
    Katha, Jannatul Ferdous
    Sarker, Sujan
    Razzaque, Md. Abdur
    2018 INTERNATIONAL CONFERENCE ON INNOVATION IN ENGINEERING AND TECHNOLOGY (ICIET), 2018,
  • [38] Multi-mode MPPT Control for Improved Efficiency
    Kwon, Jung-Min
    Choi, Woo-Young
    Kwon, Bong-Hwan
    2008 IEEE INTERNATIONAL CONFERENCE ON SUSTAINABLE ENERGY TECHNOLOGIES (ICSET), VOLS 1 AND 2, 2008, : 140 - 143
  • [39] Design and control of a multi-mode drive system
    Gilbert, JM
    Abu Hassan, AH
    1998 5TH INTERNATIONAL WORKSHOP ON ADVANCED MOTION CONTROL - PROCEEDINGS: AMC '98 - COIMBRA, 1998, : 611 - 616
  • [40] The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem
    Wauters, Tony
    Kinable, Joris
    Smet, Pieter
    Vancroonenburg, Wim
    Vanden Berghe, Greet
    Verstichel, Jannes
    JOURNAL OF SCHEDULING, 2016, 19 (03) : 271 - 283