The Process Modeling of Creating Work Breakdown Structures of Automobile R&D Project Based on PDCA

被引:0
|
作者
Yang, Ying [1 ]
Yu, Bengong [1 ]
Ma, Xijun [1 ]
机构
[1] Hefei Univ Technol, Sch Management, HFUT, Hefei, Peoples R China
关键词
work breakdown structures; creating; quality; PDCA; auomobile R&D project;
D O I
10.1109/SOLI.2008.4686414
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Work breakdown structures are the base for project management. The quality of work breakdown structures of automobile R&D project directly affects the control of the process of automobile new product development in time, cost, scope, quality and other aspects. In order to improve the quality of work breakdown structures, the paper introduces Plan-Do-Check-Action cycle and develops a distinct process model by integrating the objective management and process management. The model contains four key indicators, such as scope, awareness, responsibility and risk, to evaluate the quality of work breakdown structures in the process. The paper also presents specific tools and methods to the implementation of the model with example.
引用
收藏
页码:326 / 330
页数:5
相关论文
共 50 条
  • [41] Voluntary disclosure on project intangibles from R&D in business reporting A principles-based approach for R&D intensive companies
    Riegler, Christian
    Hoellerschmid, Christian
    JOURNAL OF INTELLECTUAL CAPITAL, 2006, 7 (04) : 511 - +
  • [42] EUPRO - A reference database on project-based R&D collaboration networks
    Scherngell, Thomas
    Barber, Michael
    Zahradnik, Georg
    Wolfmayr, Anna
    Shkodra, Xheneta Bilalli
    SCIENTIFIC DATA, 2024, 11 (01)
  • [43] MCDM-Based R&D Project Selection: A Systematic Literature Review
    de Souza, Dalton Garcia Borges
    dos Santos, Erivelton Antonio
    Soma, Nei Yoshihiro
    da Silva, Carlos Eduardo Sanches
    SUSTAINABILITY, 2021, 13 (21)
  • [44] Research on the diagnosis of R&D project termination based on fuzzy neural network
    Dong, JR
    PROCEEDINGS OF 2002 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS I AND II, 2002, : 392 - 396
  • [45] EUPRO - A reference database on project-based R&D collaboration networks
    Thomas Scherngell
    Michael Barber
    Georg Zahradnik
    Anna Wolfmayr
    Xheneta Bilalli Shkodra
    Scientific Data, 11
  • [46] A Study on Progress Risk of IUR Commissioned R&D Project Based on GERT
    Zhang Juan
    Wu Yunna
    Huang Yong
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 10628 - +
  • [47] ON SUPPLIER SELECTION OF EQUIPMENT R&D PROJECT BASED ON CLOUD TOPSIS METHOD
    Lu, Xuefeng
    Chang, Wenbing
    Zhou, Shenghan
    Zhang, Jianing
    Wang, Zhengxiang
    ICIM'2016: PROCEEDINGS OF THE 13TH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2016, : 161 - 168
  • [48] Project-based integrated risk management model of product R&D
    Tian, QF
    Yang, ND
    Jiang, JJ
    PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS 1 AND 2, 2004, : 2288 - 2293
  • [49] Modified, Stakeholders Perspective based DEA Approach in IT and R&D Project Ranking
    Kuchta, Dorota
    Skorupka, Dariusz
    Duchaczek, Artur
    Kowacka, Magdalena
    PROCEEDINGS OF THE 18TH INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS, VOL 2 (ICEIS), 2016, : 158 - 165
  • [50] Mediating Role of Firm R&D in Creating Product and Process Innovation: Empirical Evidence from Norway
    Sein, Yee Yee
    Prokop, Viktor
    ECONOMIES, 2021, 9 (02)