The Process Modeling of Creating Work Breakdown Structures of Automobile R&D Project Based on PDCA

被引:0
|
作者
Yang, Ying [1 ]
Yu, Bengong [1 ]
Ma, Xijun [1 ]
机构
[1] Hefei Univ Technol, Sch Management, HFUT, Hefei, Peoples R China
关键词
work breakdown structures; creating; quality; PDCA; auomobile R&D project;
D O I
10.1109/SOLI.2008.4686414
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Work breakdown structures are the base for project management. The quality of work breakdown structures of automobile R&D project directly affects the control of the process of automobile new product development in time, cost, scope, quality and other aspects. In order to improve the quality of work breakdown structures, the paper introduces Plan-Do-Check-Action cycle and develops a distinct process model by integrating the objective management and process management. The model contains four key indicators, such as scope, awareness, responsibility and risk, to evaluate the quality of work breakdown structures in the process. The paper also presents specific tools and methods to the implementation of the model with example.
引用
收藏
页码:326 / 330
页数:5
相关论文
共 50 条
  • [1] Tacit Knowledge Management in Automobile R&D Process
    Zhang Hao
    Zhang Fei
    Liu Jieming
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 5671 - +
  • [2] R&D project process model and AGA based scheduling algorithm
    Chen, Yingwu
    Gao, Feng
    Xin, Lining
    2005 IEEE International Conference on Mechatronics and Automations, Vols 1-4, Conference Proceedings, 2005, : 2200 - 2205
  • [3] Study on financial control in project R&D process
    Tao, P
    Li, MH
    PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, 2004, : 330 - 332
  • [4] Process analytics approach for R&D project selection
    Silva, Thushari
    Jian, Ma
    Chen, Yang
    ACM Transactions on Management Information Systems, 2014, 5 (04)
  • [5] Critical chain and evidence reasoning applied to multi-project resource schedule in automobile R&D process
    Yang, Shanlin
    Fu, Lei
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (01) : 166 - 177
  • [6] 3D Modeling of Microelectronic Structures in R&D
    Gruszka, A.
    Jozwiak, J.
    2013 IEEE WORKSHOP ON MICROELECTRONICS AND ELECTRON DEVICES (WMED), 2013, : 32 - 32
  • [7] Product quality assurance in the process of R&D work
    Antipin, V.V.
    Mironov, V.N.
    Standarty i Kachestvo, 1992, (05):
  • [8] R&D project selection using the analytic network process
    Meade, LA
    Presley, A
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2002, 49 (01) : 59 - 66
  • [9] Robust Optimization Model for R&D Project Selection under Uncertainty in the Automobile Industry
    Lee, Seunghoon
    Cho, Yongju
    Ko, Minjae
    SUSTAINABILITY, 2020, 12 (23) : 1 - 15
  • [10] Analytic Network Process Applied to R&D Project Selection
    Habib, Murad
    Khan, Raza
    Piracha, Javaid L.
    2009 INTERNATIONAL CONFERENCE ON INFORMATION AND COMMUNICATION TECHNOLOGIES, 2009, : 225 - +