Intelligent Construction Optimization Control of Construction Project Schedule Based on the Fuzzy Logic Neural Network Algorithm

被引:3
|
作者
Yu, Xiaobing [1 ]
Zuo, Hengzhong [2 ]
机构
[1] Hunan Vocat Coll Engn, Zhengzhou 410151, Hunan, Peoples R China
[2] Changsha Univ Sci & Technol, Changsha 410076, Hunan, Peoples R China
关键词
MANAGEMENT; PROGRESS; SYSTEM;
D O I
10.1155/2022/8111504
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
At present, the field of construction engineering is limited by various situations, such as complex construction environments and many uncertain factors. Therefore, on the basis of the engineering network diagram, this paper proposes a construction project schedule management method based on the fuzzy logic neural network algorithm. By building a neural network, a large amount of historical data is input, and computers are allowed to calculate the key routes, thus predicting the construction period, and a construction project in a city is taken as an example for simulation experiments. The traditional construction period management scheme expects a construction period of 55 days. The planned construction period optimized by the project management technology integrating fuzzy logic neural network algorithm is 55 days, which is 2 days less than the traditional construction project schedule management technology and will not cause construction period delay. The simulation results show that this algorithm is more accurate and more efficient in calculating the key lines when dealing with large-scale projects, which can help the construction unit to quickly find the optimal strategy and effectively reduce the construction delay and capital loss caused by uncertainty factors.
引用
收藏
页数:11
相关论文
共 50 条
  • [41] Forecasting construction project cost based on BP neural network
    Wang, Xing-ji
    2018 10TH INTERNATIONAL CONFERENCE ON MEASURING TECHNOLOGY AND MECHATRONICS AUTOMATION (ICMTMA), 2018, : 420 - 423
  • [42] Application of neural network based fuzzy logic control in the network congestion control
    Yin Feng-jie
    Jing Yuan-wei
    PROCEEDINGS OF 2005 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1 AND 2, 2005, : 1291 - 1294
  • [43] Intelligent optimization for support pressure zone algorithm based on fuzzy neural network damage identification
    Jianyang Yu
    Yuanhui Li
    EURASIP Journal on Wireless Communications and Networking, 2018
  • [44] Intelligent optimization for support pressure zone algorithm based on fuzzy neural network damage identification
    Yu, Jianyang
    Li, Yuanhui
    EURASIP JOURNAL ON WIRELESS COMMUNICATIONS AND NETWORKING, 2018,
  • [45] Retraction Note: Fuzzy neural network model construction based on shortest path parallel algorithm
    Junfeng Wang
    Tao Zhong
    Hongming Zhou
    Cluster Computing, 2023, 26 : 155 - 155
  • [46] RETRACTED ARTICLE: Fuzzy neural network model construction based on shortest path parallel algorithm
    Junfeng Wang
    Tao Zhong
    Hongming Zhou
    Cluster Computing, 2019, 22 : 3413 - 3418
  • [47] A hybrid fuzzy logic and neural network algorithm for robot motion control
    Huang, SJ
    Lian, RJ
    IEEE TRANSACTIONS ON INDUSTRIAL ELECTRONICS, 1997, 44 (03) : 408 - 417
  • [48] Construction Safety Monitoring Based on The Project's Characteristic with Fuzzy Logic Approach
    Winanda, Lila Ayu Ratna
    Adi, Trijoko Wahyu
    Anwar, Nadjadji
    Wahyuni, Febriana Santi
    3RD INTERNATIONAL CONFERENCE ON CONSTRUCTION AND BUILDING ENGINEERING (ICONBUILD 2017), 2017, 1903
  • [49] Landscape Ecological Construction and Spatial Pattern Optimization Design Based on Genetic Algorithm Optimization Neural Network
    Ban, Naiming
    Liu, Xiulong
    Zhu, Changyong
    WIRELESS COMMUNICATIONS & MOBILE COMPUTING, 2022, 2022
  • [50] Integrating Fuzzy Logic and Deep Neural Networks for Intelligent Construction Quality Management in Industrial Informatics
    Fan, Ching-Lung
    INTELLIGENT AND FUZZY SYSTEMS, INFUS 2024 CONFERENCE, VOL 1, 2024, 1088 : 324 - 331