Intelligent Construction Optimization Control of Construction Project Schedule Based on the Fuzzy Logic Neural Network Algorithm

被引:3
|
作者
Yu, Xiaobing [1 ]
Zuo, Hengzhong [2 ]
机构
[1] Hunan Vocat Coll Engn, Zhengzhou 410151, Hunan, Peoples R China
[2] Changsha Univ Sci & Technol, Changsha 410076, Hunan, Peoples R China
关键词
MANAGEMENT; PROGRESS; SYSTEM;
D O I
10.1155/2022/8111504
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
At present, the field of construction engineering is limited by various situations, such as complex construction environments and many uncertain factors. Therefore, on the basis of the engineering network diagram, this paper proposes a construction project schedule management method based on the fuzzy logic neural network algorithm. By building a neural network, a large amount of historical data is input, and computers are allowed to calculate the key routes, thus predicting the construction period, and a construction project in a city is taken as an example for simulation experiments. The traditional construction period management scheme expects a construction period of 55 days. The planned construction period optimized by the project management technology integrating fuzzy logic neural network algorithm is 55 days, which is 2 days less than the traditional construction project schedule management technology and will not cause construction period delay. The simulation results show that this algorithm is more accurate and more efficient in calculating the key lines when dealing with large-scale projects, which can help the construction unit to quickly find the optimal strategy and effectively reduce the construction delay and capital loss caused by uncertainty factors.
引用
收藏
页数:11
相关论文
共 50 条
  • [31] Construction Project Cost and Duration Optimization Using Artificial Neural Network
    Gopal, M.
    Kumar, D. Rupesh
    AEI 2015: BIRTH AND LIFE OF THE INTEGRATED BUILDING, 2015, : 433 - 444
  • [32] Construction-cost optimization model based on PSO algorithm in construction project management
    You, Liwen
    Journal of Chemical and Pharmaceutical Research, 2014, 6 (08) : 482 - 487
  • [33] Fuzzy Neural Network Algorithm Application in User Behavior Portrait Construction
    Song, Peisen
    Yu, Bengcheng
    Chen, Chen
    INTERNATIONAL JOURNAL OF ADVANCED COMPUTER SCIENCE AND APPLICATIONS, 2023, 14 (11) : 1171 - 1180
  • [34] Fuzzy Evolutionary Algorithm in Construction Project for Valuation
    Li, Huijing
    JOURNAL OF ELECTRICAL SYSTEMS, 2023, 19 (04) : 128 - 143
  • [35] Construction Project Cost Control Based on Bayesian Network
    Mo, Junwen
    Yang, Shaohua
    CONFERENCE PROCEEDINGS OF THE 6TH INTERNATIONAL SYMPOSIUM ON PROJECT MANAGEMENT (ISPM2018), 2018, : 32 - 36
  • [36] Research on Optimization Algorithm of Fuzzy Control Parameters Based on Adaptive Neural Network
    Li, Hao
    Yu, Haoyu
    Li, Xuejun
    2020 CHINESE AUTOMATION CONGRESS (CAC 2020), 2020, : 3889 - 3893
  • [37] Adaptive Optimization Control Based on Improved Genetic Algorithm and Fuzzy Neural Network
    Pengdong
    Fengdai
    Li, Ningxia
    2009 INTERNATIONAL CONFERENCE ON E-BUSINESS AND INFORMATION SYSTEM SECURITY, VOLS 1 AND 2, 2009, : 1048 - 1051
  • [38] Construction of English Translation Model Based on Neural Network Fuzzy Semantic Optimal Control
    Zhang, Bingjie
    Liu, Yiming
    COMPUTATIONAL INTELLIGENCE AND NEUROSCIENCE, 2022, 2022
  • [39] Research on risk analysis for construction project schedule based on flexible network simulation
    Zhong Zuo-wei
    Xi Bao
    Huang Qiu-guo
    Li Fang-zhen
    Proceedings of the 2006 International Conference on Management Science & Engineering (13th), Vols 1-3, 2006, : 2098 - 2103
  • [40] An Intelligent Dimming Algorithm of Streetlight Based on Fuzzy Neural Network
    Yunpeng Xue
    Yan Zhang
    Peng Shuxue
    2020 16TH INTERNATIONAL WIRELESS COMMUNICATIONS & MOBILE COMPUTING CONFERENCE, IWCMC, 2020, : 1964 - 1967