Intelligent Construction Optimization Control of Construction Project Schedule Based on the Fuzzy Logic Neural Network Algorithm

被引:3
|
作者
Yu, Xiaobing [1 ]
Zuo, Hengzhong [2 ]
机构
[1] Hunan Vocat Coll Engn, Zhengzhou 410151, Hunan, Peoples R China
[2] Changsha Univ Sci & Technol, Changsha 410076, Hunan, Peoples R China
关键词
MANAGEMENT; PROGRESS; SYSTEM;
D O I
10.1155/2022/8111504
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
At present, the field of construction engineering is limited by various situations, such as complex construction environments and many uncertain factors. Therefore, on the basis of the engineering network diagram, this paper proposes a construction project schedule management method based on the fuzzy logic neural network algorithm. By building a neural network, a large amount of historical data is input, and computers are allowed to calculate the key routes, thus predicting the construction period, and a construction project in a city is taken as an example for simulation experiments. The traditional construction period management scheme expects a construction period of 55 days. The planned construction period optimized by the project management technology integrating fuzzy logic neural network algorithm is 55 days, which is 2 days less than the traditional construction project schedule management technology and will not cause construction period delay. The simulation results show that this algorithm is more accurate and more efficient in calculating the key lines when dealing with large-scale projects, which can help the construction unit to quickly find the optimal strategy and effectively reduce the construction delay and capital loss caused by uncertainty factors.
引用
收藏
页数:11
相关论文
共 50 条
  • [1] Network Comprehensive Optimization for Schedule and Cost in Project Construction Based on PSO Algorithm
    Huang, Yuansheng
    Qiu, Zilong
    Zhang, Weina
    2008 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS, VOLS 1-6, 2008, : 1260 - 1264
  • [2] The Schedule Optimization and Control of Nuclear Power Construction Project Prophase Based on Petri Network
    Lei, Yu
    Xu, Hu
    Zhang, Ruyu
    Ding, Yan
    Lin, Jianfeng
    Liu, Lirong
    Qin, Lei
    PROCEEDINGS OF THE 2015 6TH INTERNATIONAL CONFERENCE ON MANUFACTURING SCIENCE AND ENGINEERING, 2016, 32 : 248 - 255
  • [3] A RBF fuzzy logic neural network algorithm for construction resource scheduling
    Yu, Xiaobing
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2021, 41 (04) : 4937 - 4945
  • [4] Fuzzy optimization of construction engineering project schedule based on critical chain management
    Liu, J. (Liujb71@sina.cn), 2013, Universitas Ahmad Dahlan, Jalan Kapas 9, Semaki, Umbul Harjo,, Yogiakarta, 55165, Indonesia (11):
  • [5] Research on Risk Prediction of Construction Section in Construction Project Based on Fuzzy Artificial Neural Network
    Yu, Miao
    PROCEEDINGS OF THE 2017 5TH INTERNATIONAL CONFERENCE ON FRONTIERS OF MANUFACTURING SCIENCE AND MEASURING TECHNOLOGY (FMSMT 2017), 2017, 130 : 263 - 267
  • [6] Fuzzy optimization of construction project network with multiple objectives
    Kumar, A. V. S. S.
    Faheem, B. Mir Iqbal
    INNOVATIONS IN STRUCTURAL ENGINEERING AND CONSTRUCTION, VOLS 1 AND 2, 2008, : 1433 - +
  • [7] Construction and Optimization of Fuzzy Rule-Based Classifier with a Swarm Intelligent Algorithm
    Mao, Li
    Chen, Qidong
    Sun, Jun
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2020, 2020
  • [8] Integration of fuzzy logic, particle swarm optimization and neural networks in quality assessment of construction project
    Shi H.
    Li W.
    Journal of Software, 2010, 5 (07) : 737 - 744
  • [9] Prediction of Construction Schedule Based on BP Neural Network
    Li, Zhaolin
    Zhang, Guozhi
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 3423 - +
  • [10] The construction schedule of medium voltage overhead distribution network is optimized based on neural network algorithm
    Li X.
    Yan T.
    Tan Y.
    EAI Endorsed Transactions on Energy Web, 2023, 10