New data acquisition system for beam loss monitor used in J-PARC main ring

被引:2
|
作者
Satou, K. [1 ]
Toyama, T. [1 ]
Kamikubota, N. [1 ]
Yoshida, S. [2 ]
Matsushita, J. [3 ]
Wakita, T. [4 ]
Sugiyama, M. [5 ]
Morino, T. [6 ]
机构
[1] High Energy Accelerator Res Org, Accelerator Div, Japan Proton Accelerator Res Complex, Tokai, Ibaraki 3191195, Japan
[2] Kanto Informat Serv, Tsuchiura, Ibaraki 3000045, Japan
[3] GIGA Co, Yokohama, Kanagawa 2220026, Japan
[4] Hirak Co Ltd, Machida, Tokyo 1950055, Japan
[5] SED Ltd, Zama, Kanagawa 2520027, Japan
[6] Morino Tech Serv Co Ltd, Kamagaya, Chiba 2730113, Japan
关键词
J-PARC; Beam loss monitor; Data acquisition system; Front-end isolation amp; ADC;
D O I
10.1016/j.nima.2018.01.014
中图分类号
TH7 [仪器、仪表];
学科分类号
0804 ; 080401 ; 081102 ;
摘要
A new data acquisition system has been developed continually as a part of the development of a new beam loss monitor (BLM) system for the J-PARC main ring. This development includes a newly designed front-end isolation amp that uses photo-couplers and a VME-based new analog-to-digital converter (ADC) system. Compared to the old amp, the new amp has a 10 times higher conversion impedance for the input current to the output voltage; this value is 1 M Omega. Moreover, the bandwidth was improved to from DC to 50 kHz, which is about two orders of magnitude greater than the previously used bandwidth. The theoretical estimations made in this study roughly agree with the frequency response obtained for the new system. The new ADC system uses an onboard field-programmable gate array chip for signal processing. By replacing the firmware of this chip, changes pertaining to future accelerator upgrade plans may be introduced into the new ADC system; in addition, the ADC system can be used in other applications. The sampling speed of the system is 1 MS/s, and it exhibits a 95 dBc spurious-free dynamic range and 16.5 effective number of bits. The obtained waveform and integrated charge data are compared with two reference levels in the ADC system. If the data exceeds the reference level, the system generates an alarm to dump the beams. By using the new data acquisition system, it was proved that the new BLM system shows a wide dynamic range of 160 dB. In this study, the details of the new data acquisition system are described. (C) 2018 The Authors. Published by Elsevier B.V. This is an open access article under the CC BY license (http://creativecommons.org/licenses/by/4.0/).
引用
收藏
页码:174 / 183
页数:10
相关论文
共 50 条
  • [31] High Intensity Beam Operation of J-PARC RCS With Minimum Beam Loss
    Saha, P. K.
    Harada, H.
    Shobuda, Y.
    Tamura, F.
    Okita, H.
    Okabe, K.
    Nakanoya, T.
    Hatakeyama, S.
    Moriya, K.
    Takayanagi, T.
    Hotchi, H.
    IPAC23 PROCEEDINGS, 2024, 2687
  • [32] New optics design of injection/fast extraction/abort lines of J-PARC Main Ring
    Tomizawai, M.
    Molodozhentsev, A.
    Nakamura, E.
    Sakai, I.
    Uota, M.
    2007 IEEE PARTICLE ACCELERATOR CONFERENCE, VOLS 1-11, 2007, : 2729 - 2731
  • [33] Optical system of beam induced fluorescence monitor toward MW beam power at the j-PARC neutrino beamline
    Cao, S.
    Friend, M.
    Sakashita, K.
    Hartz, M.
    Nakamura, A.
    Proceedings of the 7th International Beam Instrumentation Conference, IBIC 2018, 2018,
  • [34] High Intensity Beam Operation of J-PARC RCS with Minimum Beam Loss
    Saha, P.K.
    Harada, H.
    Shobuda, Y.
    Tamura, F.
    Okita, H.
    Okabe, K.
    Nakanoya, T.
    Hatakeyama, S.
    Moriya, K.
    Takayanagi, T.
    Hotchi, H.
    Journal of Physics: Conference Series, 2024, 2687 (05):
  • [35] Stability of neutron beam monitor for High Intensity Total Diffractometer at J-PARC
    Ohshita, Hidetoshi
    Otomo, Toshiya
    Uno, Shoji
    Ikeda, Kazutaka
    Uchida, Tomohisa
    Kaneko, Naokatsu
    Koike, Takahisa
    Shoji, Masayoshi
    Suzuya, Kentaro
    Seya, Tomohiro
    Tsubota, Masami
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2012, 672 : 75 - 81
  • [36] Stability of neutron beam monitor for High Intensity Total Diffractometer at J-PARC
    Ohshita, Hidetoshi
    Otomo, Toshiya
    Uno, Shoji
    Ikeda, Kazutaka
    Uchida, Tomohisa
    Kaneko, Naokatsu
    Koike, Takahisa
    Shoji, Masayoshi
    Suzuya, Kentaro
    Seya, Tomohiro
    Tsubota, Masami
    Nuclear Instruments and Methods in Physics Research, Section A: Accelerators, Spectrometers, Detectors and Associated Equipment, 2012, 672 : 75 - 81
  • [37] Slow extraction from the J-PARC main ring using a dynamic bump
    Tomizawa, M.
    Arakaki, Y.
    Kimura, T.
    Muto, R.
    Murasugi, S.
    Okamura, K.
    Sato, H.
    Shirakabe, Y.
    Yanaoka, E.
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2018, 902 : 51 - 61
  • [38] Suppression of Beam Loss at the First Arc Section in the J-PARC Linac
    Sako, Hiroyuki
    Ikegami, Masanori
    IEEE TRANSACTIONS ON NUCLEAR SCIENCE, 2010, 57 (05) : 2783 - 2789
  • [39] Suppression of beam loss at the first arc section in the J-PARC linac
    Sako, Hiroyuki
    Ikegami, Masanori
    IEEE Transactions on Nuclear Science, 2010, 57 (5 PART 3): : 2783 - 2789
  • [40] The development and beam test of an RF chopper system for J-PARC
    Wang, S
    Fu, SN
    Kato, T
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2005, 547 (2-3): : 302 - 312