New data acquisition system for beam loss monitor used in J-PARC main ring

被引:2
|
作者
Satou, K. [1 ]
Toyama, T. [1 ]
Kamikubota, N. [1 ]
Yoshida, S. [2 ]
Matsushita, J. [3 ]
Wakita, T. [4 ]
Sugiyama, M. [5 ]
Morino, T. [6 ]
机构
[1] High Energy Accelerator Res Org, Accelerator Div, Japan Proton Accelerator Res Complex, Tokai, Ibaraki 3191195, Japan
[2] Kanto Informat Serv, Tsuchiura, Ibaraki 3000045, Japan
[3] GIGA Co, Yokohama, Kanagawa 2220026, Japan
[4] Hirak Co Ltd, Machida, Tokyo 1950055, Japan
[5] SED Ltd, Zama, Kanagawa 2520027, Japan
[6] Morino Tech Serv Co Ltd, Kamagaya, Chiba 2730113, Japan
关键词
J-PARC; Beam loss monitor; Data acquisition system; Front-end isolation amp; ADC;
D O I
10.1016/j.nima.2018.01.014
中图分类号
TH7 [仪器、仪表];
学科分类号
0804 ; 080401 ; 081102 ;
摘要
A new data acquisition system has been developed continually as a part of the development of a new beam loss monitor (BLM) system for the J-PARC main ring. This development includes a newly designed front-end isolation amp that uses photo-couplers and a VME-based new analog-to-digital converter (ADC) system. Compared to the old amp, the new amp has a 10 times higher conversion impedance for the input current to the output voltage; this value is 1 M Omega. Moreover, the bandwidth was improved to from DC to 50 kHz, which is about two orders of magnitude greater than the previously used bandwidth. The theoretical estimations made in this study roughly agree with the frequency response obtained for the new system. The new ADC system uses an onboard field-programmable gate array chip for signal processing. By replacing the firmware of this chip, changes pertaining to future accelerator upgrade plans may be introduced into the new ADC system; in addition, the ADC system can be used in other applications. The sampling speed of the system is 1 MS/s, and it exhibits a 95 dBc spurious-free dynamic range and 16.5 effective number of bits. The obtained waveform and integrated charge data are compared with two reference levels in the ADC system. If the data exceeds the reference level, the system generates an alarm to dump the beams. By using the new data acquisition system, it was proved that the new BLM system shows a wide dynamic range of 160 dB. In this study, the details of the new data acquisition system are described. (C) 2018 The Authors. Published by Elsevier B.V. This is an open access article under the CC BY license (http://creativecommons.org/licenses/by/4.0/).
引用
收藏
页码:174 / 183
页数:10
相关论文
共 50 条
  • [21] Simulation study on the slow extraction for the improvement of the beam shill structure at J-PARC Main Ring
    Muto, R.
    Kimura, T.
    Murasugi, S.
    Okamura, K.
    Shirakabe, Y.
    Tomizawa, M.
    Yanaoka, E.
    Numai, K.
    Matsumura, A.
    IPAC23 PROCEEDINGS, 2024, 2687
  • [22] Development of new synchronized data system for J-PARC RCS
    Takahashi, H.
    Saha, P. K.
    Yoshimoto, M.
    Sawabe, Y.
    IPAC23 PROCEEDINGS, 2024, 2687
  • [23] Data acquisition system for high resolution chopper spectrometer (HRC) at J-PARC
    Graduate School of Science and Engineering, Aoyama Gaguin University, Sagamihara 252-5258, Japan
    不详
    不详
    不详
    Nucl Instrum Methods Phys Res Sect A, 1 (421-426):
  • [24] Developments of the calibation tools for beam position monitor at J-PARC LINAC
    Sato, S
    Tomisawa, T
    Akikawa, H
    Ueno, A
    Lee, S
    Igarashi, Z
    Ikegami, M
    Toyama, T
    Kamikubota, N
    2005 IEEE PARTICLE ACCELERATOR CONFERENCE (PAC), VOLS 1-4, 2005, : 1848 - 1850
  • [25] Current status of slow extraction from J-PARC Main Ring
    Muto, R.
    Arakaki, Y.
    Kimura, T.
    Murasugi, S.
    Okada, M.
    Okamura, K.
    Shimogawa, T.
    Shirakabe, Y.
    Tomizawa, M.
    Toyama, T.
    Yanaoka, E.
    Matsumura, A.
    10TH INTERNATIONAL PARTICLE ACCELERATOR CONFERENCE, 2019, 1350
  • [26] Updated model of the resistive wall impedance for the main ring of J-PARC
    Yee-Rendon, B.
    Chin, Y. H.
    Kuboki, H.
    Schenk, M.
    Toyama, T.
    9TH INTERNATIONAL PARTICLE ACCELERATOR CONFERENCE (IPAC18), 2018, 1067
  • [27] The fast extraction kicker power supply for the main ring of J-PARC
    Koseki, Kunio
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2013, 729 : 3 - 7
  • [28] Thermal neutron profile inside J-PARC main ring tunnel
    Oyama, T.
    Hagiwara, M.
    Nakamura, H.
    Shirakata, M. J.
    Nagaguro, S.
    Yamazaki, H.
    Nishikawa, K.
    Sanami, T.
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2019, 937 : 98 - 106
  • [29] Measurement of the longitudinal coupled bunch instabilities in the J-PaRC main ring
    Sugiyama, Y.
    Yoshii, M.
    Tamura, F.
    Proceedings of the 6th International Beam Instrumentation Conference, IBIC 2017, 2017, : 225 - 228
  • [30] Unified Beam Control System of J-PARC Linac
    Sako, Hiroyuki
    Allen, Christopher K.
    Ikeda, Hiroshi
    Shen, Guobao
    IEEE TRANSACTIONS ON NUCLEAR SCIENCE, 2010, 57 (03) : 1528 - 1535