Causes-Effects Relationship of Construction Project Delays in Ghana: Focusing on Local Government Projects

被引:3
|
作者
Ametepey, Simon Ofori [1 ]
Gyadu-Asiedu, William [1 ]
Assah-Kissiedu, Millicent [1 ]
机构
[1] Koforidua Tech Univ, Fac Built & Nat Environm, Koforidua, Ghana
关键词
Causes; Construction; Effects; Ghana; Local government; Project delay;
D O I
10.1007/978-3-319-60450-3_9
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Project delays in the construction industry are a worldwide phenomenon and local government construction projects in Ghana are not an exception. The paper presents the results of a survey conducted to identify and assess the severity of the causes of local government construction project delays and their effect in Ghana. In previous research, the causes and the effects of project delays has been studied without considering the possible relationship that exist between them. This study takes a combined approach and also sought to analyze the relationship between specific causes on specific effects. The results of the study revealed the main causes of schedule delays in local government construction projects as: delay in progress payments; variation orders during construction; difficulties in financing projects by contractors; delay in material delivery; and unforeseen site conditions. The study further identified the effects of delay as: time overrun; cost overrun; delay by contractor in repayment of loans; disputes; and poor quality work due to speeding up of work. The study also established an empirical correlation between each cause and effect. The study revealed that bulk of the effects of delay of local government construction projects is triggered by client-related and contractor-related causes.
引用
收藏
页码:84 / 95
页数:12
相关论文
共 50 条
  • [41] Stakeholder perceptions on causes and effects of public project failures in Ghana
    Christopher Dick-Sagoe
    Ka Yiu Lee
    Daniel Odoom
    Peggy Otiwaa Boateng
    Humanities and Social Sciences Communications, 10
  • [42] Local Government and Traditional Authorities in Ghana: Towards a More Productive Relationship
    Mahama, Callistus
    COMMONWEALTH JOURNAL OF LOCAL GOVERNANCE, 2009, (04): : 7 - 25
  • [43] Streamlining the management of payment delays: the case of Sri Lankan Government building construction projects
    Perera, B. A. K. S.
    Dewagoda, Kaveesha Gihani
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2021, 26 (02) : 236 - 256
  • [44] IMPACT OF A MAJOR EXOGENOUS CONSTRUCTION PROJECT ON LOCAL GOVERNMENT FINANCE
    WICKS, JM
    GRIFFING, JM
    WESTERN ECONOMIC JOURNAL, 1969, 7 (03): : 269 - 269
  • [45] An integrated approach to investigate the causes of time delays and cost overruns in Afghanistan construction projects
    Sadat, Hafizullah
    Thomas, Nivea
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024,
  • [46] Investigation into the Causes of Delays and Cost Overruns in Uganda's Public Sector Construction Projects
    Alinaitwe, Henry
    Apolot, Ruth
    Tindiwensi, Dan
    JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2013, 18 (02) : 33 - 47
  • [47] An integrative literature review on the causes of delays in construction projects: evidence from developing countries
    Selcuk, Onur
    Turkoglu, Harun
    Polat, Gul
    Hajdu, Miklos
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (06) : 610 - 622
  • [48] Identifying and Ranking the Root Causes of Schedule Delays in Oil and Gas Pipeline Construction Projects
    Alshibani, Adel
    Julaih, Mohammed
    Adress, Ahamd
    Alshamrani, Othman
    Almaziad, Faris
    ENERGIES, 2023, 16 (01)
  • [49] An Approach to the Analysis of Causes of Delays in Industrial Construction Projects through Planning and Statistical Computing
    Araujo-Rey, Carlos
    Sebastian, Miguel A.
    SUSTAINABILITY, 2021, 13 (07)
  • [50] Effects of team diversity on project performance in construction projects
    Wu, Guangdong
    Zhao, Xianbo
    Zuo, Jian
    Zillante, George
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2019, 26 (03) : 408 - 423