Causes-Effects Relationship of Construction Project Delays in Ghana: Focusing on Local Government Projects

被引:3
|
作者
Ametepey, Simon Ofori [1 ]
Gyadu-Asiedu, William [1 ]
Assah-Kissiedu, Millicent [1 ]
机构
[1] Koforidua Tech Univ, Fac Built & Nat Environm, Koforidua, Ghana
关键词
Causes; Construction; Effects; Ghana; Local government; Project delay;
D O I
10.1007/978-3-319-60450-3_9
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Project delays in the construction industry are a worldwide phenomenon and local government construction projects in Ghana are not an exception. The paper presents the results of a survey conducted to identify and assess the severity of the causes of local government construction project delays and their effect in Ghana. In previous research, the causes and the effects of project delays has been studied without considering the possible relationship that exist between them. This study takes a combined approach and also sought to analyze the relationship between specific causes on specific effects. The results of the study revealed the main causes of schedule delays in local government construction projects as: delay in progress payments; variation orders during construction; difficulties in financing projects by contractors; delay in material delivery; and unforeseen site conditions. The study further identified the effects of delay as: time overrun; cost overrun; delay by contractor in repayment of loans; disputes; and poor quality work due to speeding up of work. The study also established an empirical correlation between each cause and effect. The study revealed that bulk of the effects of delay of local government construction projects is triggered by client-related and contractor-related causes.
引用
收藏
页码:84 / 95
页数:12
相关论文
共 50 条
  • [21] CAUSES AND EFFECTS OF VARIATIONS ON CONSTRUCTION PROJECTS
    Jayawardena, Nishadi
    Ramachandra, Thanuja
    Rotimi, James
    SUSTAINABLE SOLUTIONS IN STRUCTURAL ENGINEERING AND CONSTRUCTION, 2014, : 483 - 488
  • [22] Causes and Impacts of Delays in Ethiopian Public Construction Projects (Case on Debre Markos University Construction Projects)
    Demissew, Abebe
    Abiy, Fasika
    ADVANCES IN CIVIL ENGINEERING, 2023, 2023
  • [23] Causes of delays in construction project for developing Southeast Asia countries
    Wuala, H. D.
    Rarasati, A. D.
    INTERNATIONAL CONFERENCE ON INNOVATION IN ENGINEERING AND VOCATIONAL EDUCATION 2019 (ICIEVE 2019), PTS 1-4, 2020, 830
  • [24] Causes, Implications, and Strategies for Project Closeout Delays in Highway Construction
    Tummalapudi, Manideep
    Harper, Christofer M.
    Taylor, Timothy R. B.
    Waddle, Steve
    Catchings, Rachel
    TRANSPORTATION RESEARCH RECORD, 2022, 2676 (09) : 479 - 490
  • [25] Underlying causes and mitigation measures of delays in construction projects An empirical study
    Arantes, Amilcar
    Ferreira, Luis Miguel D. F.
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2020, 25 (02) : 165 - 181
  • [26] Causes and effects of delays in Malaysian construction industry
    Sambasivan, Murali
    Soon, Yau Wen
    International Journal of Project Management, 2007, 25 (05) : 517 - 526
  • [27] Towards a sustainable construction industry: Delays and cost overrun causes in construction projects of Oman
    Al Amri, Tariq
    Marey-Perez, Manuel
    JOURNAL OF PROJECT MANAGEMENT, 2020, 5 (02) : 87 - 102
  • [28] Study the delays and conflicts for construction projects and their mutual relationship: A review
    Tariq, Junaid
    Gardezi, S. Shujaa Safdar
    AIN SHAMS ENGINEERING JOURNAL, 2023, 14 (01)
  • [29] Assessing the causes of project overruns in tunnel construction projects in Pakistan
    Ayat, Muhammad
    Rehman, Hafeezur
    Qureshi, Sheheryar Mohsin
    Kang, Chang Wook
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (11) : 1856 - 1866
  • [30] Forensic project management: The underlying causes of rework in construction projects
    Love, P
    Edwards, D
    CIVIL ENGINEERING AND ENVIRONMENTAL SYSTEMS, 2004, 21 (03) : 207 - 228