A Novel Approach for Predicting the Height of Water-Conducting Fracture Zone under the High Overburden Caving Strength Based on Optimized Processes

被引:18
|
作者
Hu, Tao [1 ]
Hou, Gongyu [1 ,2 ]
Bu, Su [3 ]
Zhu, Zhen [4 ]
Wang, Yan [5 ]
Hu, Ziyi [5 ]
Li, Zixiang [1 ]
机构
[1] China Univ Min & Technol, Sch Mech & Civil Engn, Beijing 100083, Peoples R China
[2] Xinjiang Inst Engn, Sch Min Engn, Gurumukhi 830091, Peoples R China
[3] China Univ Min & Technol, Sch Law & Humanities, Beijing 100083, Peoples R China
[4] Qingdao Univ Technol, Sch Civil Engn, Qingdao 266033, Peoples R China
[5] Shandong Energy Grp CO LTD, Jinan 250000, Peoples R China
关键词
water-conducting fracture zone (WCFZ); Brillouin optical time-domain reflectometry (BOTDR); approach based on optimized processes; overburden; high overburden caving strength; optical fiber strain; STRATA; DEFORMATION; ROOF;
D O I
10.3390/pr8080950
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
The height of water-conducting fracture zones (WCFZs) is vital for the prevention of water, gas, and roof accidents in coal mines. However, its dynamic evolution law and maximum height are difficult to be obtained by traditional prediction methods, especially for conditions in which there is high overburden caving strength and a thick coal seam. Therefore, taking the 150,313 fully mechanized caving working face in Yingying Coal Mine as a background, according to the principle of optimized processes, a new predicting approach based on the Brillouin optical time-domain reflectometry (BOTDR) is proposed. Firstly, we estimated the height through empirical formula calculation, theoretical analysis, and similar model simulation tests. Secondly, we studied the optimized layout of optical cables in the overburden in detail for predicting the maximum height of the WCFZ and keeping the cables in good performance during field prediction. Thirdly, we researched and optimized the borehole parameters, optical fiber selection, and the special protection measures. Finally, we applied the aforementioned optimized outcomes in the field experiment to dynamically predict the height of the WCFZ. As a result of the field experiment, the distribution characteristics of optical fiber strain, the maximum height, and the evolution law of the WCFZ were obtained through the regular monitoring of fiber strain using BOTDR. The experiment demonstrated that its maximum height is consistent with the results studied indoors. The validation and feasibility of the approach proposed in this paper were verified via the aforementioned studies. The research in this paper has good reference value and important significance for predicting the height of the WCFZ using BOTDR in coal mines with similar geological and productive conditions.
引用
收藏
页数:23
相关论文
共 50 条
  • [41] A Novel Approach for Predicting the Height of the Water-Flow Fracture Zone in Undersea Safety Mining
    Dai, Bing
    Chen, Ying
    REMOTE SENSING, 2020, 12 (03)
  • [42] Prediction of the height of water-conducting fracture zone and water-filling model of roof aquifer in Jurassic coalfield in Ordos Basin
    Xue J.
    Wang H.
    Zhao C.
    Yang J.
    Zhou Z.
    Li D.
    Wang, Hao (xuejiankun@cctegxian.com), 1600, China University of Mining and Technology (37): : 1222 - 1230
  • [43] Predicting Water Flowing Fracture Zone Height Using GRA and Optimized Neural Networks
    Dong, Haofu
    Yang, Genfa
    Guo, Keyin
    Xu, Junyu
    Liu, Deqiang
    Han, Jin
    Shi, Dongrui
    Pan, Jienan
    PROCESSES, 2024, 12 (11)
  • [44] Development Law of Water-Conducting Fracture Zone in the Fully Mechanized Caving Face of Gob-Side Entry Driving: A Case Study
    Tan, Yi
    Xu, Han
    Yan, Weitao
    Guo, Wenbing
    Sun, Qi
    Yin, Dawei
    Zhang, Yujiang
    Zhang, Xiaoqiang
    Jing, Xiaofei
    Li, Xiaoshuang
    Wei, Sijiang
    Liu, Xiao
    MINERALS, 2022, 12 (05)
  • [45] Predicting the Height of Water-Conducting Fissure Zones in a Jurassic Coalfield Based on AdaBoost-WOA-BPNN
    Hou, Enke
    Bi, Meng
    Long, Tianwen
    Xie, Xiaoshen
    Hou, Pengfei
    Li, Qianlong
    MINE WATER AND THE ENVIRONMENT, 2025,
  • [46] An approach to predict the height of fractured water-conducting zone of coal roof strata using random forest regression
    Zhao, Dekang
    Wu, Qiang
    SCIENTIFIC REPORTS, 2018, 8
  • [47] An approach to predict the height of fractured water-conducting zone of coal roof strata using random forest regression
    Dekang Zhao
    Qiang Wu
    Scientific Reports, 8
  • [48] An Improved Back Propagation Neural Network Based on Differential Evolution and Grey Wolf Optimizer and Its Application in the Height Prediction of Water-Conducting Fracture Zone
    Wang, Houzhu
    Zhu, Jingzhong
    Li, Wenping
    APPLIED SCIENCES-BASEL, 2024, 14 (11):
  • [49] Feature of overlying rock failure and height of water-conducting fracture zone after multi-coal mining in Shendong Mining Area
    Xu Z.
    Li Q.
    Zhang G.
    Yang Y.
    Sun C.
    Journal of Mining and Strata Control Engineering, 2023, 5 (06)
  • [50] Determination of Fractured Water-Conducting Zone Height Based on Microseismic Monitoring: A Case Study in Weigiang Coalmine, Shaanxi, China
    Gao, Wei
    Li, Yingchun
    He, Qingyuan
    SUSTAINABILITY, 2022, 14 (14)