A Novel Approach for Predicting the Height of Water-Conducting Fracture Zone under the High Overburden Caving Strength Based on Optimized Processes

被引:18
|
作者
Hu, Tao [1 ]
Hou, Gongyu [1 ,2 ]
Bu, Su [3 ]
Zhu, Zhen [4 ]
Wang, Yan [5 ]
Hu, Ziyi [5 ]
Li, Zixiang [1 ]
机构
[1] China Univ Min & Technol, Sch Mech & Civil Engn, Beijing 100083, Peoples R China
[2] Xinjiang Inst Engn, Sch Min Engn, Gurumukhi 830091, Peoples R China
[3] China Univ Min & Technol, Sch Law & Humanities, Beijing 100083, Peoples R China
[4] Qingdao Univ Technol, Sch Civil Engn, Qingdao 266033, Peoples R China
[5] Shandong Energy Grp CO LTD, Jinan 250000, Peoples R China
关键词
water-conducting fracture zone (WCFZ); Brillouin optical time-domain reflectometry (BOTDR); approach based on optimized processes; overburden; high overburden caving strength; optical fiber strain; STRATA; DEFORMATION; ROOF;
D O I
10.3390/pr8080950
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
The height of water-conducting fracture zones (WCFZs) is vital for the prevention of water, gas, and roof accidents in coal mines. However, its dynamic evolution law and maximum height are difficult to be obtained by traditional prediction methods, especially for conditions in which there is high overburden caving strength and a thick coal seam. Therefore, taking the 150,313 fully mechanized caving working face in Yingying Coal Mine as a background, according to the principle of optimized processes, a new predicting approach based on the Brillouin optical time-domain reflectometry (BOTDR) is proposed. Firstly, we estimated the height through empirical formula calculation, theoretical analysis, and similar model simulation tests. Secondly, we studied the optimized layout of optical cables in the overburden in detail for predicting the maximum height of the WCFZ and keeping the cables in good performance during field prediction. Thirdly, we researched and optimized the borehole parameters, optical fiber selection, and the special protection measures. Finally, we applied the aforementioned optimized outcomes in the field experiment to dynamically predict the height of the WCFZ. As a result of the field experiment, the distribution characteristics of optical fiber strain, the maximum height, and the evolution law of the WCFZ were obtained through the regular monitoring of fiber strain using BOTDR. The experiment demonstrated that its maximum height is consistent with the results studied indoors. The validation and feasibility of the approach proposed in this paper were verified via the aforementioned studies. The research in this paper has good reference value and important significance for predicting the height of the WCFZ using BOTDR in coal mines with similar geological and productive conditions.
引用
收藏
页数:23
相关论文
共 50 条
  • [21] Formation mechanism and height calculation of the caved zone and water-conducting fracture zone in solid backfill mining
    Lei Li
    Fengming Li
    Yong Zhang
    Daming Yang
    Xue Liu
    International Journal of Coal Science & Technology, 2020, 7 : 208 - 215
  • [22] Study on Fracture Evolution and Water-Conducting Fracture Zone Height beneath the Sandstone Fissure Confined Aquifer
    Xu, Jiabo
    Yang, Daming
    Zhang, Zhenquan
    Sun, Yun
    Zhao, Linshuang
    SUSTAINABILITY, 2024, 16 (14)
  • [23] The prediction of height of water-conducting fractured zone in overburden strata of seam using grey artificial neural networks
    Lu, Hai-Feng
    Yao, Duo-Xi
    Hu, You-Biao
    Chen, Shan-Cheng
    Electronic Journal of Geotechnical Engineering, 2015, 20 (13): : 5787 - 5799
  • [24] Machine Learning Model for Predicting the Height of the Water-Conducting Fracture Zone Considering the Influence of Key Stratum and Dip Mining Intensity
    Che, Yuhang
    Cui, Ximin
    Wang, Yuanjian
    Li, Peixian
    WATER, 2025, 17 (02)
  • [25] Prediction of the height of water-conducting fracture zone using the FA-ALO-SVR model
    Bi, Yaoshan
    Shen, Shuhao
    Wu, Jiwen
    Li, Dong
    EARTH SCIENCE INFORMATICS, 2025, 18 (01)
  • [26] Study on Height Development Characteristics of Water-Conducting Fracture Zone in Fully Mechanized Mining of Shallow Thick Coal Seam under Water
    Chang, Xikun
    Wang, Mingguo
    Zhu, Wei
    Fan, Jinmeng
    Liu, Mingyang
    SUSTAINABILITY, 2023, 15 (09)
  • [27] Development and Height Prediction of Fractured Water-Conducting Zone in Weakly Cemented Overburden: A Case Study of Tashidian Erjingtian Mine
    Zhang, Lifei
    Zhang, Zizhao
    Wang, Kaikai
    Tan, Xiaodong
    Zhang, Lei
    Zhang, Tiandong
    SUSTAINABILITY, 2023, 15 (18)
  • [28] Development Law of Water-Conducting Fracture Zones in Overburden above Fully Mechanized Top-Coal Caving Face: A Comprehensive Study
    Hu, Tao
    Han, Kaiqiang
    Song, Chunhua
    Che, Jiancheng
    Li, Bo
    Huo, Taihu
    Hu, Tongxu
    PROCESSES, 2024, 12 (10)
  • [29] In Situ Monitoring and Predicting the Height of Water-Conducting Fractured Zone of Jurassic Coal Seam in Northwestern China
    Qiao, Wei
    Liu, Mengnan
    Li, Wenping
    Wang, Qiqing
    Cheng, Xianggang
    Li, Xiaoqin
    ENGINEERING GEOLOGY FOR A HABITABLE EARTH, VOL 3, IAEG XIV CONGRESS 2023, 2024, : 541 - 570
  • [30] Prediction of the Height of Water-Conducting Fissure Zone for Shallow-Buried Coal Seams Under Fully Mechanized Caving Conditions in Northern Shaanxi Province
    Chen, Wei
    Geng, Shujia
    Chen, Xi
    Li, Tao
    Tsangaratos, Paraskevas
    Ilia, Ioanna
    WATER, 2025, 17 (03)