共 50 条
- [31] A method for analyzing and designing frictional rock bolting systems in room-and-pillar mining MINE PLANNING AND EQUIPMENT SELECTION 2000, 2000, : 349 - 353
- [32] GEOMECHANICAL SUBSTANTIATION OF PILLAR-AND-ROOM SEQUENCES OF MINING THE PROTECTIVE LAYER SOVIET MINING SCIENCE USSR, 1991, 27 (04): : 269 - 275
- [33] APPLICATION OF WORKSTATION SOFTWARE TO NUMERICAL MODELING OF ROOM-AND-PILLAR COAL-MINING TRANSACTIONS OF THE INSTITUTION OF MINING AND METALLURGY SECTION A-MINING INDUSTRY, 1992, 101 : A89 - A94
- [35] Arc-shaped bulkhead applied in short-wall room-and-pillar mining Electronic Journal of Geotechnical Engineering, 2014, 19 (Z6): : 17617 - 17625
- [36] IMMEDIATE ROOF STABILITY ANALYSIS FOR NEW ROOM-AND-PILLAR MINING TECHNOLOGY IN "ESTONIA" MINE ENVIRONMENT, TECHNOLOGY, RESOURCES, PROCEEDINGS, 2005, : 262 - 269
- [37] CLASSIFICATION OF PROTECTIVE PILLARS TOWARD HIGHER SAFETY AND INNOVATION IN ROOM-AND-PILLAR COAL MINING EURASIAN MINING, 2020, (02): : 24 - 27
- [39] Applicable Conditions of Room-and-Pillar Mining Goaf Treatment Methods under a Traffic Load APPLIED SCIENCES-BASEL, 2023, 13 (03):