Technological and geomechanical parameters of room-and-pillar system of mining a thick flat seam

被引:4
|
作者
Egorov, PV [1 ]
Kalinin, SI
Agudalin, BP
机构
[1] Kuzbass State Tech Univ, Kemerovo, Russia
[2] State Sci Res Inst Geomech & Surveying, Siberian Branch, Interbranch Sci Ctr, VNIMI, Prokopyevsk, Russia
[3] Uglekop Mine, Joint Stock Co, Mezhdurechensk, Russia
关键词
room; pillar; block; displacement; rate; area; rock pressure;
D O I
10.1023/A:1015166906969
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
The results of experimental investigations are considered for mining a thick scam with a hard-to-cave roof by room-and-pillar system; the quantitative values of its parameters and criterion for the step of main roof caving with respect to outcropping area are established. Technological parameters and control of rock pressure manifestation are substantiated.
引用
收藏
页码:472 / 474
页数:3
相关论文
共 50 条
  • [21] Analysis of the roof span stability in terms of room-and-pillar system of ore deposit mining
    Zhienbayev, Abzal
    Balpanova, Merey
    Asanova, Zhanar
    Zharaspaev, Madiyar
    Nurkasyn, Rustem
    Zhakupov, Bolegen
    MINING OF MINERAL DEPOSITS, 2023, 17 (01): : 129 - 137
  • [22] Analysis of "box-girder-bridge" structural for upward fully mechanized mining in room-and-pillar mining goaf of shallow close distance seam
    Zhang J.
    Liu Q.
    Yang T.
    Zhou F.
    Wang B.
    Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2019, 36 (05): : 867 - 872
  • [23] Geotechnical risk management to prevent coal outburst in room-and-pillar mining
    Peter, Zhang
    Scott, Peterson
    Dan, Neilans
    Scott, Wade
    Ryan, McGrady
    Joe, Pugh
    INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2016, 26 (01) : 9 - 18
  • [24] Ventilation of Mine Workings Exploited by the Room-and-Pillar Mining Method.
    Deniau, Robert
    1600,
  • [25] Zones of technogenic water-conducting cracks by room-and-pillar mining
    Zubkov, V. V.
    Zubkova, I. A.
    GEOMECHANICS AND GEODYNAMICS OF ROCK MASSES (EUROCK2018), VOLS 1 AND 2, 2018, : 1081 - 1083
  • [26] Reducing mining tailings and operational dilution: a new application of the room-and-pillar mining method
    Rodovalho, E.
    El Hajj, T. M.
    Teodoro, G. C.
    de Tomi, G.
    Tenorio, J. A. S.
    JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2024, 124 (08) : 483 - 490
  • [27] Geotechnical risk management to prevent coal outburst in room-and-pillar mining
    Zhang Peter
    Peterson Scott
    Neilans Dan
    Wade Scott
    Mc Grady Ryan
    Pugh Joe
    InternationalJournalofMiningScienceandTechnology, 2016, 26 (01) : 9 - 18
  • [28] Stability and control of room-and-pillar mined-out area in shallow coal seam
    Liu, Xinxin
    Qi, Xueyuan
    Geng, Junjun
    Journal of Mining and Strata Control Engineering, 2024, 6 (02)
  • [29] Strength calculations of block elements of room-and-pillar mining under permafrost conditions
    Buzilo, V.
    Savelieva, T.
    Saveliev, V.
    NEW TECHNIQUES AND TECHNOLOGIES IN MINING, 2010, : 47 - 50
  • [30] ROOM-AND-PILLAR MINING AT PRINCE MINE OF CAPE-BRETON DEVELOPMENT CORPORATION
    MACLEAN, AR
    MERNER, D
    CIM BULLETIN, 1977, 70 (779): : 80 - 80