An Assignment-Based Continuous-Time MILP Model for the Resource-Constrained Project Scheduling Problem

被引:0
|
作者
Rihm, Tom [1 ]
Trautmann, Norbert [1 ]
机构
[1] Univ Bern, Dept Business Adm, Schuetzenmattstr 14, CH-3012 Bern, Switzerland
关键词
Mixed-Integer Linear Programming; Operations Research; Project Management; Resource-Constrained Project Scheduling; LIMITED RESOURCES; FORMULATION;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The widely studied resource-constrained project scheduling problem consists of determining the start times for a set of precedence-related project activities requiring time and scarce resources during execution such that the total project duration is minimized. In the literature, in addition to a large variety of specific solution approaches, various mixed-integer linear programming (MILP) models have been proposed for this problem. We present a novel MILP model that is based on explicit assignment and sequencing variables; we enhance the performance of the model by eliminating some symmetric solutions from the search space and by modifying the sequencing constraints for pairs of activities that cannot be processed in parallel. Our computational results for four standard test sets from the literature indicate that this novel model outperforms two state-of-the-art models, particularly when resources are very scarce.
引用
收藏
页码:35 / 39
页数:5
相关论文
共 50 条
  • [41] Scheduling Rules Based on Gene Expression Programming for Resource-Constrained Project Scheduling Problem
    贾艳
    李晋航
    Journal of Donghua University(English Edition), 2015, 32 (01) : 91 - 96
  • [42] Model Research of Multi-Objective and Resource-Constrained Project Scheduling Problem
    Zhou, Rong
    Ye, Chun-ming
    Ma, Hui-min
    19TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT: MANAGEMENT SYSTEM INNOVATION, 2013, : 991 - 1001
  • [43] The Proactive Resource-Constrained Project Scheduling Problem with Resource Transfer Times
    Ma, Zhiqiang
    He, Zhengwen
    Wang, Nengmin
    PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 642 - 647
  • [44] Continuous Time MILP Models for Multi-Mode Resource Constrained Project Scheduling Problems
    Ozturk, Guler
    Oner, Adalet
    2020 9TH INTERNATIONAL CONFERENCE ON INDUSTRIAL TECHNOLOGY AND MANAGEMENT (ICITM 2020), 2020, : 51 - 56
  • [45] Modeling of and algorithm for resource-constrained project scheduling problem with resource allocation dependent processing time
    Liu X.
    Lu Z.
    Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2017, 51 (01): : 82 - 89
  • [46] Heuristic Methods for Finance-Based and Resource-Constrained Project Scheduling Problem
    Liu, Wanlin
    Zhang, Jingwen
    Li, Wanjun
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (11)
  • [47] An efficient simulation algorithm for Resource-Constrained Project Scheduling Problem
    Peng, L.
    Wuliang, P.
    Open Mechanical Engineering Journal, 2014, 8 (01): : 9 - 13
  • [48] A constraint programming approach for the resource-constrained project scheduling problem
    Liess, Olivier
    Michelon, Philippe
    ANNALS OF OPERATIONS RESEARCH, 2008, 157 (01) : 25 - 36
  • [49] Hybrid Heuristics for Dynamic Resource-Constrained Project Scheduling Problem
    Villela da Silva, Andre Renato
    Ochi, Luiz Satoru
    HYBRID METAHEURISTICS, 2010, 6373 : 73 - 87
  • [50] Improved Compact Models for the Resource-Constrained Project Scheduling Problem
    Tesch, Alexander
    OPERATIONS RESEARCH PROCEEDINGS 2016, 2018, : 25 - 30