Two-staged early cost estimation for highway construction projects

被引:6
|
作者
Kim, Du Yon [1 ]
Kim, Byoungil [1 ]
Han, Seung Heon [1 ]
机构
[1] Yonsei Univ, Dept Civil & Environm Engn, Seoul 120749, South Korea
关键词
early cost estimate; highway construction project; case-based reasoning; regression tree; quantity-based model;
D O I
10.3846/isarc.20080626.490
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The quality of early cost estimates is critical to the feasibility analysis and budget allocation decisions for public capital projects. Various research have been attempted to develop cost prediction models in the early stage of a construction life-cycle. However, existing studies are limited on its applicability to actual projects because they focus primarily on a specific phase as well as utilize restricted information while the amount of information collectable differs from one another along with the project stages. This research aims to develop two-staged cost estimation model for the schematic planning and preliminary design process of a construction projects, considering the available information of each phase. In the schematic planning stage where outlined information of a project is only available, the case-based reasoning model is used for easy and rapid elicitation of a project cost based on the extensive database of more than 90 actual highway construction projects. Then, the representing quantity-based model is proposed for the preliminary design stage where more information on the quantities and unit costs are collectable based on the alternative routes and cross-sections of a highway project. Real case studies are used to demonstrate and validate the benefits of the proposed approach. Through the two-stage cost estimation system, users are able to hold a timely prospect to presume the final cost within the budge such that feasibility study as well as budget allocation decisions are made on effectively and competitively.
引用
收藏
页码:490 / 495
页数:6
相关论文
共 50 条
  • [41] Two-Staged Technology for CoCr Stent Production by SLM
    Kilina, Polina
    Drozdov, Andrey
    Kuchumov, Alex G.
    Morozov, Evgeniy
    Sirotenko, Lyudmila
    Smetkin, Andrey
    MATERIALS, 2024, 17 (21)
  • [42] Two-Staged Image Colorization Based on Salient Contours
    Anagnostopoulos, N.
    Iakovidou, C.
    Amanatiadis, A.
    Boutalis, Y.
    Chatzichristofis, S. A.
    2014 IEEE INTERNATIONAL CONFERENCE ON IMAGING SYSTEMS & TECHNIQUES (IST), 2014, : 381 - 385
  • [43] Predicting hyperkalemia by a two-staged artificial neural network
    Wu, MF
    Chiang, JJ
    Yang, YC
    Chao, IH
    Shieh, SM
    Tzeng, WC
    Hsieh, JC
    COMPUTERS IN CARDIOLOGY 2003, VOL 30, 2003, 30 : 433 - 435
  • [44] An efficient two-staged approach for generating block layouts
    Chen, YK
    Lin, SW
    Chou, SY
    COMPUTERS & OPERATIONS RESEARCH, 2002, 29 (05) : 489 - 504
  • [45] Two-Staged Open Surgical Approach for Aortoesophageal Fistula
    Meji, Camilo A. Velasquez
    Chaar, Cassius I. Ochoa
    Brownstein, Adam J.
    Elefteriades, John A.
    JOURNAL OF VASCULAR SURGERY, 2018, 67 (06) : E245 - E245
  • [46] Decontamination of radioactive wastewater by two-staged chemical precipitation
    Osmanlioglu, Ahmet E.
    NUCLEAR ENGINEERING AND TECHNOLOGY, 2018, 50 (06) : 886 - 889
  • [47] Two-staged reconstruction of the flexor pollicis longus tendon
    Unglaub, F.
    Bultmann, C.
    Reiter, A.
    Hahn, P.
    JOURNAL OF HAND SURGERY-BRITISH AND EUROPEAN VOLUME, 2006, 31B (04): : 432 - 435
  • [48] Auxiliary two-staged partial resection liver transplantation
    Pål-Dag Line
    Silvio Nadalin
    Deniz Balci
    BMC Surgery, 21
  • [49] Generic feature modules: Two-staged program customization
    Apel, Sven
    Kuhlemann, Martin
    Leich, Thomas
    ICSOFT 2006: Proceedings of the First International Conference on Software and Data Technologies, Vol 1, 2006, : 127 - 132
  • [50] Forecasting Completed Cost of Highway Construction Projects Using LASSO Regularized Regression
    Zhang, Yuanxin
    Minchin, R. Edward, Jr.
    Agdas, Duzgun
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (10)