Two-staged early cost estimation for highway construction projects

被引:6
|
作者
Kim, Du Yon [1 ]
Kim, Byoungil [1 ]
Han, Seung Heon [1 ]
机构
[1] Yonsei Univ, Dept Civil & Environm Engn, Seoul 120749, South Korea
关键词
early cost estimate; highway construction project; case-based reasoning; regression tree; quantity-based model;
D O I
10.3846/isarc.20080626.490
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The quality of early cost estimates is critical to the feasibility analysis and budget allocation decisions for public capital projects. Various research have been attempted to develop cost prediction models in the early stage of a construction life-cycle. However, existing studies are limited on its applicability to actual projects because they focus primarily on a specific phase as well as utilize restricted information while the amount of information collectable differs from one another along with the project stages. This research aims to develop two-staged cost estimation model for the schematic planning and preliminary design process of a construction projects, considering the available information of each phase. In the schematic planning stage where outlined information of a project is only available, the case-based reasoning model is used for easy and rapid elicitation of a project cost based on the extensive database of more than 90 actual highway construction projects. Then, the representing quantity-based model is proposed for the preliminary design stage where more information on the quantities and unit costs are collectable based on the alternative routes and cross-sections of a highway project. Real case studies are used to demonstrate and validate the benefits of the proposed approach. Through the two-stage cost estimation system, users are able to hold a timely prospect to presume the final cost within the budge such that feasibility study as well as budget allocation decisions are made on effectively and competitively.
引用
收藏
页码:490 / 495
页数:6
相关论文
共 50 条
  • [31] The analysis on quality-cost of construction process in highway engineering projects
    Xiao Zelin
    PROCEEDINGS OF 2006 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 569 - 572
  • [32] Preliminary Cost Estimation of Highway Projects Using Statistical Learning Methods
    Zhang, Yuanxin
    Minchin Jr, R. Edward
    Flood, Ian
    Ries, Robert J.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2023, 149 (05)
  • [33] Estimation of Cost Contingency for Air Force Construction Projects
    Thal, Alfred E., Jr.
    Cook, Jason J.
    White, Edward D., III
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2010, 136 (11): : 1181 - 1188
  • [34] Cost estimation model for semiconductor hookup construction projects
    Wen, Chao-Pao
    Hsiao, Fan-Yi
    Wang, Shih-Hsu
    Wang, Wei-Chih
    Yu, Wen-Der
    Journal of the Chinese Institute of Civil and Hydraulic Engineering, 2013, 25 (04): : 273 - 282
  • [35] A model for preliminary cost estimation in buildings construction projects
    Jassim, Hassanean S. H.
    Hasan, Musaab F.
    Altaee, Mohammed J.
    Gamil, Yaser
    FRONTIERS IN BUILT ENVIRONMENT, 2025, 11
  • [36] Preliminary cost estimation of highway construction using neural networks
    Al-Tabtabai, Hashem
    Alex, Alex P.
    Tantash, Maha
    Cost Engineering (Morgantown, West Virginia), 1999, 41 (03): : 19 - 24
  • [37] Two-staged pseudospark switch triggered by glow discharge
    Qin, Feng
    Ding, Enyan
    Chang, Anbi
    Luo, Min
    Jin, Xiao
    Qiangjiguang Yu Lizishu/High Power Laser and Particle Beams, 2013, 25 (SUPPL.1): : 173 - 176
  • [38] Auxiliary two-staged partial resection liver transplantation
    Line, Pal-Dag
    Nadalin, Silvio
    Balci, Deniz
    BMC SURGERY, 2021, 21 (01)
  • [39] Two-staged hepato-pancreatoduodenectomy and interventional pancreaticojejunostomy
    Cho, A
    Arita, S
    Koike, N
    Isaka, N
    Kusume, K
    Okazumi, S
    Makino, H
    Tohma, T
    Matsubara, K
    Gunji, H
    Ochiai, T
    HEPATO-GASTROENTEROLOGY, 2005, 52 (66) : 1886 - 1888
  • [40] A New Two-Staged Method for Total Columellar Reconstruction
    Vaena, Michel L. H. T.
    Alessio, Caterina G.
    Sicalo, Kevin
    Queiroz, Felipe de Olveira Brito
    Albuquerque, Roberta R. de Souza
    da Silva, Danielli R. L.
    LARYNGOSCOPE, 2025, 135 (01): : 118 - 120