Two-staged early cost estimation for highway construction projects

被引:6
|
作者
Kim, Du Yon [1 ]
Kim, Byoungil [1 ]
Han, Seung Heon [1 ]
机构
[1] Yonsei Univ, Dept Civil & Environm Engn, Seoul 120749, South Korea
关键词
early cost estimate; highway construction project; case-based reasoning; regression tree; quantity-based model;
D O I
10.3846/isarc.20080626.490
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The quality of early cost estimates is critical to the feasibility analysis and budget allocation decisions for public capital projects. Various research have been attempted to develop cost prediction models in the early stage of a construction life-cycle. However, existing studies are limited on its applicability to actual projects because they focus primarily on a specific phase as well as utilize restricted information while the amount of information collectable differs from one another along with the project stages. This research aims to develop two-staged cost estimation model for the schematic planning and preliminary design process of a construction projects, considering the available information of each phase. In the schematic planning stage where outlined information of a project is only available, the case-based reasoning model is used for easy and rapid elicitation of a project cost based on the extensive database of more than 90 actual highway construction projects. Then, the representing quantity-based model is proposed for the preliminary design stage where more information on the quantities and unit costs are collectable based on the alternative routes and cross-sections of a highway project. Real case studies are used to demonstrate and validate the benefits of the proposed approach. Through the two-stage cost estimation system, users are able to hold a timely prospect to presume the final cost within the budge such that feasibility study as well as budget allocation decisions are made on effectively and competitively.
引用
收藏
页码:490 / 495
页数:6
相关论文
共 50 条
  • [1] CONCEPTUAL ESTIMATION OF CONSTRUCTION DURATION AND COST OF PUBLIC HIGHWAY PROJECTS
    Mohamed, Basma
    Moselhi, Osama
    JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2022, 27 : 595 - 618
  • [2] CONCEPTUAL ESTIMATION OF CONSTRUCTION DURATION AND COST OF PUBLIC HIGHWAY PROJECTS
    Mohamed, Basma
    Moselhi, Osama
    Journal of Information Technology in Construction, 2022, 27 : 595 - 618
  • [3] Early Highway Construction Cost Estimation: Selection of Key Cost Drivers
    Simic, Nevena
    Ivanisevic, Nenad
    Nedeljkovic, Dorde
    Senic, Aleksandar
    Stojadinovic, Zoran
    Ivanovic, Marija
    SUSTAINABILITY, 2023, 15 (06)
  • [4] Estimation of signal parameters in two-staged processes elaboration
    Radchenko, YS
    IZVESTIYA VYSSHIKH UCHEBNYKH ZAVEDENII RADIOELEKTRONIKA, 2005, 48 (7-8): : 56 - 63
  • [5] Impact of packaging on the cost of highway construction projects
    Zhang, Zhihui
    He, Qianru
    Qinghua Daxue Xuebao/Journal of Tsinghua University, 2010, 50 (06): : 830 - 833
  • [6] A brief on cost controls of highway construction projects
    Liu, Y.
    Gong, G.
    Zhan, X.
    SUSTAINABLE BUILDINGS AND STRUCTURES: BUILDING A SUSTAINABLE TOMORROW, 2020, : 17 - 17
  • [7] The CSS and The Two-Staged Methods for Parameter Estimation in SARFIMA Models
    Egrioglu, Erol
    Aladag, Cagdas Hakan
    Kadilar, Cem
    JOURNAL OF PROBABILITY AND STATISTICS, 2011, 2011
  • [8] A HIGHWAY CONSTRUCTION COST ESTIMATION WORKSTATION
    ENGELKE, C
    ROTHROCK, T
    SHAH, VC
    33RD ANNUAL MEETING OF THE AMERICAN ASSOCIATION OF COST ENGINEERS, 1989, : 381 - 389
  • [9] Two-staged ALU architecture
    Sun, HP
    Gao, ML
    2002 6TH INTERNATIONAL CONFERENCE ON SIGNAL PROCESSING PROCEEDINGS, VOLS I AND II, 2002, : 410 - 413
  • [10] Two-staged estimation of variance components in generalized linear mixed models
    Pawitan, Y
    JOURNAL OF STATISTICAL COMPUTATION AND SIMULATION, 2001, 69 (01) : 1 - 17