A New Algorithm for the Open-Pit Mine Production Scheduling Problem

被引:106
|
作者
Chicoisne, Renaud [1 ]
Espinoza, Daniel [1 ]
Goycoolea, Marcos [2 ]
Moreno, Eduardo [3 ]
Rubio, Enrique [4 ,5 ]
机构
[1] Univ Chile, Dept Ind Engn, Santiago 8370439, Chile
[2] Univ Adolfo Ibanez, Sch Business, Santiago 7941169, Chile
[3] Univ Adolfo Ibanez, Fac Sci & Engn, Santiago 7941169, Chile
[4] Univ Chile, Dept Min Engn, Santiago 8370439, Chile
[5] Univ Chile, Adv Min Technol Ctr, Santiago 8370439, Chile
关键词
MAXIMUM-FLOW PROBLEM; PSEUDOFLOW;
D O I
10.1287/opre.1120.1050
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
For the purpose of production scheduling, open-pit mines are discretized into three-dimensional arrays known as block models. Production scheduling consists of deciding which blocks should be extracted, when they should be extracted, and what to do with the blocks once they are extracted. Blocks that are close to the surface should be extracted first, and capacity constraints limit the production in each time period. Since the 1960s, it has been known that this problem can be cast as an integer programming model. However, the large size of some real instances (3-10 million blocks, 15-20 time periods) has made these models impractical for use in real planning applications, thus leading to the use of numerous heuristic methods. In this article we study a well-known integer programming formulation of the problem that we refer to as C-PIT. We propose a new decomposition method for solving the linear programming relaxation (LP) of C-PIT when there is a single capacity constraint per time period. This algorithm is based on exploiting the structure of the precedence-constrained knapsack problem and runs in O(mn log n) in which n is the number of blocks and m a function of the precedence relationships in the mine. Our computations show that we can solve, in minutes, the LP relaxation of real-sized mine-planning applications with up to five million blocks and 20 time periods. Combining this with a quick rounding algorithm based on topological sorting, we obtain integer feasible solutions to the more general problem where multiple capacity constraints per time period are considered. Our implementation obtains solutions within 6% of optimality in seconds. A second heuristic step, based on local search, allows us to find solutions within 3% in one hour on all instances considered. For most instances, we obtain solutions within 1-2% of optimality if we let this heuristic run longer. Previous methods have been able to tackle only instances with up to 150,000 blocks and 15 time periods.
引用
收藏
页码:517 / 528
页数:12
相关论文
共 50 条
  • [31] Research on Vehicle Dispatching Problem in Open-Pit Coal Mine
    Liu, She
    Wang, Shijie
    Ren, Huizhi
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON MANAGEMENT AND ENGINEERING (CME 2014), 2014, : 1388 - 1392
  • [32] A strengthened formulation and cutting planes for the open pit mine production scheduling problem
    Bley, Andreas
    Boland, Natashia
    Fricke, Christopher
    Froyland, Gary
    COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (09) : 1641 - 1647
  • [33] Route selection algorithm of open-pit mine transportation system
    Liu G.
    Chai S.
    Bai R.
    Zhao J.
    Li H.
    Zhang J.
    Meitan Xuebao/Journal of the China Coal Society, 2019, 44 (12): : 3931 - 3940
  • [34] Short-term scheduling of an open-pit mine with multiple objectives
    Blom, Michelle
    Pearce, Adrian R.
    Stuckey, Peter J.
    ENGINEERING OPTIMIZATION, 2017, 49 (05) : 777 - 795
  • [35] A Comprehensive Study of Several Meta-Heuristic Algorithms for Open-Pit Mine Production Scheduling Problem Considering Grade Uncertainty
    Tolouei, K.
    Moosavi, E.
    Tabrizi, A. H. Bangian
    Afzal, P.
    Bazzazi, A. Aghajani
    JOURNAL OF MINING AND ENVIRONMENT, 2020, 11 (03): : 721 - 736
  • [36] Fundamental tree algorithm in optimising production scheduling for open pit mine design
    Ramazan, S.
    Dagdelen, K.
    Johnson, T. B.
    TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2005, 114 (01): : 45 - 54
  • [37] ECSTALL STORY - OPEN-PIT MINE
    COUPLAND, GC
    CIM BULLETIN, 1974, 67 (745): : 64 - 69
  • [38] Efficient simulation for an open-pit mine
    Dendle, Nicholas
    Isokangas, Erik
    Corry, Paul
    SIMULATION MODELLING PRACTICE AND THEORY, 2022, 117
  • [39] Solving Challenges at an Open-Pit Mine
    GPS World, 2021, 32 (04): : 24 - 25
  • [40] TRUCK REQUIREMENTS IN AN OPEN-PIT MINE
    MADGE, DN
    OPERATIONS RESEARCH, 1963, 11 : B123 - B123