A New Algorithm for the Open-Pit Mine Production Scheduling Problem

被引:106
|
作者
Chicoisne, Renaud [1 ]
Espinoza, Daniel [1 ]
Goycoolea, Marcos [2 ]
Moreno, Eduardo [3 ]
Rubio, Enrique [4 ,5 ]
机构
[1] Univ Chile, Dept Ind Engn, Santiago 8370439, Chile
[2] Univ Adolfo Ibanez, Sch Business, Santiago 7941169, Chile
[3] Univ Adolfo Ibanez, Fac Sci & Engn, Santiago 7941169, Chile
[4] Univ Chile, Dept Min Engn, Santiago 8370439, Chile
[5] Univ Chile, Adv Min Technol Ctr, Santiago 8370439, Chile
关键词
MAXIMUM-FLOW PROBLEM; PSEUDOFLOW;
D O I
10.1287/opre.1120.1050
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
For the purpose of production scheduling, open-pit mines are discretized into three-dimensional arrays known as block models. Production scheduling consists of deciding which blocks should be extracted, when they should be extracted, and what to do with the blocks once they are extracted. Blocks that are close to the surface should be extracted first, and capacity constraints limit the production in each time period. Since the 1960s, it has been known that this problem can be cast as an integer programming model. However, the large size of some real instances (3-10 million blocks, 15-20 time periods) has made these models impractical for use in real planning applications, thus leading to the use of numerous heuristic methods. In this article we study a well-known integer programming formulation of the problem that we refer to as C-PIT. We propose a new decomposition method for solving the linear programming relaxation (LP) of C-PIT when there is a single capacity constraint per time period. This algorithm is based on exploiting the structure of the precedence-constrained knapsack problem and runs in O(mn log n) in which n is the number of blocks and m a function of the precedence relationships in the mine. Our computations show that we can solve, in minutes, the LP relaxation of real-sized mine-planning applications with up to five million blocks and 20 time periods. Combining this with a quick rounding algorithm based on topological sorting, we obtain integer feasible solutions to the more general problem where multiple capacity constraints per time period are considered. Our implementation obtains solutions within 6% of optimality in seconds. A second heuristic step, based on local search, allows us to find solutions within 3% in one hour on all instances considered. For most instances, we obtain solutions within 1-2% of optimality if we let this heuristic run longer. Previous methods have been able to tackle only instances with up to 150,000 blocks and 15 time periods.
引用
收藏
页码:517 / 528
页数:12
相关论文
共 50 条
  • [21] Modelling and Optimizing an Open-Pit Truck Scheduling Problem
    Chang, Yonggang
    Ren, Huizhi
    Wang, Shijie
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2015, 2015
  • [22] Production schedule optimization in open-pit coal mine
    Gu, Xiao-Wei
    Xu, Xiao-Chuan
    Wang, Qing
    Zheng, You-Yi
    Dongbei Daxue Xuebao/Journal of Northeastern University, 2013, 34 (08): : 1184 - 1187
  • [23] Production scheduling of open-pit mines using genetic algorithm: a case study
    Alipour, Aref
    Khodaiari, Ali Asghar
    Jafari, Ahmad
    Tavakkoli-Moghaddam, Reza
    INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2020, 15 (03) : 176 - 183
  • [24] Aggregation heuristic for the open-pit block scheduling problem
    Jelvez, Enrique
    Morales, Nelson
    Nancel-Penard, Pierre
    Peypouquet, Juan
    Reyes, Patricio
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 249 (03) : 1169 - 1177
  • [25] A SOLUTION TO THE PROBLEM OF SCHEDULING AND REPLACEMENT IN OPEN-PIT MINES
    WANG, Q
    SEVIM, H
    DETOMI, G
    21ST APPLICATION OF THE COMPUTERS AND OPERATIONS RESEARCH IN THE MINERAL INDUSTRY, 1989, : 662 - 673
  • [26] The Influence of Rainfall on Landslide Stability of an Open-Pit Mine: The Case of Haizhou Open-Pit Mine
    An Bo
    Zhu Chun
    Liu Kuiming
    Li Sitong
    Tao Zhigang
    Li Haipeng
    Yu Haoran
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2019, 37 (04) : 3367 - 3378
  • [27] The Influence of Rainfall on Landslide Stability of an Open-Pit Mine: The Case of Haizhou Open-Pit Mine
    An Bo
    Zhu Chun
    Liu Kuiming
    Li Sitong
    Tao Zhigang
    Li Haipeng
    Yu Haoran
    Geotechnical and Geological Engineering, 2019, 37 : 3367 - 3378
  • [28] An integrated approach to open-pit mines production scheduling
    Alipour, Aref
    Khodaiari, Ali Asghar
    Jafari, Ahmad
    Tavakkoli-Moghaddam, Reza
    RESOURCES POLICY, 2022, 75
  • [29] Optimization of open-pit mine design and production planning with an improved floating cone algorithm
    Turan, Gokhan
    Onur, Ahmet Hakan
    OPTIMIZATION AND ENGINEERING, 2023, 24 (02) : 1157 - 1181
  • [30] Optimization of open-pit mine design and production planning with an improved floating cone algorithm
    Gokhan Turan
    Ahmet Hakan Onur
    Optimization and Engineering, 2023, 24 : 1157 - 1181