An Integrated Risk Management Model for Construction Projects

被引:3
|
作者
Zhao, Zhen-Yu [1 ]
Duan, Lin-Ling [1 ]
机构
[1] N China Elect Power Univ, Sch Business Adm, Beijing, Peoples R China
关键词
D O I
10.1109/PICMET.2008.4599751
中图分类号
F [经济];
学科分类号
02 ;
摘要
Construction enterprises are affected by various risk factors. To awaken the consciousness of the risks management, and to enhance the mechanism, techniques and skills of construction projects' risk management in China, This paper present an integrated risk management model. It consists of three modules named as Risk Mechanism, Quantification Analysis System and Optimizing Decision-making. Risk mechanism, as a basis of risk integrated management, involves the establishment of risk management culture and risks-resisted mechanism. Quantification analysis system, using the risk transfer theory, proposes the devices and network system for detecting construction project risks. Optimizing decision making includes the project resource optimization measures and project risk avoiding method. The establishment of the model creates a new approach for risk quantification and assessment to improve the risk management effects.
引用
收藏
页码:1389 / 1394
页数:6
相关论文
共 50 条
  • [41] Integrated Schedule Information Model for Airport Construction Projects
    Jia, Guangshe
    Xue, Xiangdong
    Cao, Li
    Chen, Jianguo
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL 1, 2008, : 71 - 77
  • [42] Integrating project risk management into the management of engineering construction projects
    Jobling, P
    INNOVATION IN CIVIL AND CONSTRUCTION ENGINEERING, 1997, : 183 - 187
  • [43] Impacts of change management on risk and cost management of a construction projects
    Halou, Mohamed Ibrahim Khalifa
    Samin, Razali
    Ahmad, Mushtaq
    JOURNAL OF PROJECT MANAGEMENT, 2019, 4 (02) : 157 - 164
  • [44] Quality cost management model for construction projects
    Dolacek-Alduk, Zlata
    Radujkovic, Mladen
    Mikulic, Dunja
    GRADEVINAR, 2009, 61 (02): : 147 - 156
  • [45] A Dynamical Model of Program Management on Construction Projects
    Wang Yang
    Liang Zheng
    DATA PROCESSING AND QUANTITATIVE ECONOMY MODELING, 2010, : 212 - 219
  • [46] An injury risk model for large construction projects
    Søren Spangenberg
    Risk Management, 2009, 11 : 111 - 134
  • [47] An injury risk model for large construction projects
    Spangenberg, Soren
    RISK MANAGEMENT-AN INTERNATIONAL JOURNAL, 2009, 11 (02): : 111 - 134
  • [48] Study and practice on integrated management model for high-speed railway construction projects in China
    China Railway Corporation, Beijing
    100844, China
    Tiedao Xuebao, 11 (1-8):
  • [49] The Innovative Research of the Integrated Management of Construction Projects under IT Background
    Zhou, Dongjiang
    2014 2ND INTERNATIONAL CONFERENCE IN HUMANITIES, SOCIAL SCIENCES AND GLOBAL BUSINESS MANAGEMENT (ISSGBM 2014), VOL 30, 2014, 30 : 384 - 388
  • [50] Information integrated management of hydropower construction projects for EPC constractor
    Zhong, Denghua
    Cui, Bo
    Cai, Shaokuan
    Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2010, 29 (01): : 114 - 119