An Integrated Risk Management Model for Construction Projects

被引:3
|
作者
Zhao, Zhen-Yu [1 ]
Duan, Lin-Ling [1 ]
机构
[1] N China Elect Power Univ, Sch Business Adm, Beijing, Peoples R China
关键词
D O I
10.1109/PICMET.2008.4599751
中图分类号
F [经济];
学科分类号
02 ;
摘要
Construction enterprises are affected by various risk factors. To awaken the consciousness of the risks management, and to enhance the mechanism, techniques and skills of construction projects' risk management in China, This paper present an integrated risk management model. It consists of three modules named as Risk Mechanism, Quantification Analysis System and Optimizing Decision-making. Risk mechanism, as a basis of risk integrated management, involves the establishment of risk management culture and risks-resisted mechanism. Quantification analysis system, using the risk transfer theory, proposes the devices and network system for detecting construction project risks. Optimizing decision making includes the project resource optimization measures and project risk avoiding method. The establishment of the model creates a new approach for risk quantification and assessment to improve the risk management effects.
引用
收藏
页码:1389 / 1394
页数:6
相关论文
共 50 条
  • [21] Risk Management for Housing and Construction Projects
    Yang J.
    Yin S.
    Journal of Engineering, Project, and Production Management, 2024, 14 (01)
  • [22] Risk Management Methods in Construction Projects
    Rehacek, Petr
    Bazsova, Blanka
    VISION 2020: SUSTAINABLE ECONOMIC DEVELOPMENT, INNOVATION MANAGEMENT, AND GLOBAL GROWTH, VOLS I-IX, 2017, 2017, : 3060 - 3069
  • [23] Risk management for overseas construction projects
    Zhi, He
    International Journal of Project Management, 1995, 13 (04):
  • [24] Financial risk management in the construction projects
    Shibani A.
    Hasan D.
    Saaifan J.
    Sabboubeh H.
    Eltaip M.
    Saidani M.
    Gherbal N.
    Journal of King Saud University - Engineering Sciences, 2024, 36 (08) : 552 - 561
  • [25] RISK AND ITS MANAGEMENT IN CONSTRUCTION PROJECTS
    PERRY, JG
    HAYES, RW
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1985, 78 (JUN): : 499 - 521
  • [26] PROGRAM MANAGEMENT ORGANIZATION MATURITY INTEGRATED MODEL FOR MEGA CONSTRUCTION PROJECTS IN CHINA
    Jia, Guangshe
    Chen, Yuting
    Xue, Xiangdong
    Chen, Jianguo
    Cao, Jiming
    Tang, Kewei
    PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON SUSTAINABLE URBANIZATION (ICSU 2010), 2010, : 336 - 350
  • [27] Integrated 4D Design Change Management Model for Construction Projects
    Wang, Liannian
    Lee, Joomyung
    Nimawat, Jatin
    Han, Kevin
    Gupta, Abhinav
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (05)
  • [28] Designing Human Health Risk Management Model for Dam Construction Projects
    Ghorbanalipour, R.
    Ahmadvand, A. M.
    Ahmadvand, M.
    Eghbali, H.
    CIVIL ENGINEERING JOURNAL-TEHRAN, 2018, 4 (09): : 2173 - 2185
  • [29] Developing a generic risk maturity model (GRMM) for evaluating risk management in construction projects
    Hoseini, Erfan
    Hertogh, Marcel
    Bosch-Rekveldt, Marian
    JOURNAL OF RISK RESEARCH, 2021, 24 (07) : 889 - 908
  • [30] The Integrated Management in the Large-Scale Projects' Construction
    Liu, Yisheng
    Bao, Lijia
    Chen, Xu
    LISS 2013, 2015, : 329 - 334