An Integrated Risk Management Model for Construction Projects

被引:3
|
作者
Zhao, Zhen-Yu [1 ]
Duan, Lin-Ling [1 ]
机构
[1] N China Elect Power Univ, Sch Business Adm, Beijing, Peoples R China
关键词
D O I
10.1109/PICMET.2008.4599751
中图分类号
F [经济];
学科分类号
02 ;
摘要
Construction enterprises are affected by various risk factors. To awaken the consciousness of the risks management, and to enhance the mechanism, techniques and skills of construction projects' risk management in China, This paper present an integrated risk management model. It consists of three modules named as Risk Mechanism, Quantification Analysis System and Optimizing Decision-making. Risk mechanism, as a basis of risk integrated management, involves the establishment of risk management culture and risks-resisted mechanism. Quantification analysis system, using the risk transfer theory, proposes the devices and network system for detecting construction project risks. Optimizing decision making includes the project resource optimization measures and project risk avoiding method. The establishment of the model creates a new approach for risk quantification and assessment to improve the risk management effects.
引用
收藏
页码:1389 / 1394
页数:6
相关论文
共 50 条
  • [1] A risk management model for construction projects
    Smit, S
    Al-Jibouri, S
    van den Adel, J
    SYSTEM-BASED VISION FOR STRATEGIC AND CREATIVE DESIGN, VOLS 1-3, 2003, : 2233 - 2238
  • [2] Risk management system model for construction projects
    Titarenko, Boris
    Hasnaoui, Amir
    Titarenko, Roman
    XXI INTERNATIONAL SCIENTIFIC CONFERENCE ON ADVANCED IN CIVIL ENGINEERING CONSTRUCTION - THE FORMATION OF LIVING ENVIRONMENT (FORM 2018), 2018, 365
  • [3] Integrated knowledge management model and system for construction projects
    Kanapeckiene, L.
    Kaklauskas, A.
    Zavadskas, E. K.
    Seniut, M.
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2010, 23 (07) : 1200 - 1215
  • [4] Integrated model for BIM and risk data in construction projects
    Yasser, Mamdoh
    Rashid, Ibrahim Abdel
    Nagy, Alsayed Mohamed
    Elbehairy, Hatem Shaker
    ENGINEERING RESEARCH EXPRESS, 2022, 4 (04):
  • [5] Integrated Risk Management on Construction Projects: Owner's Perspective
    Mu, Shiyu
    Zhao, Jianjun
    PROCEEDINGS OF 2012 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2012, : 496 - 499
  • [6] Methodology for Integrated Risk Management and Proactive Scheduling of Construction Projects
    Schatteman, Damien
    Herroelen, Willy
    Van de Vonder, Stijn
    Boone, Anton
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (11) : 885 - 893
  • [7] Quality risk management model for railway construction projects
    Li Qing
    Liu Rengkui
    Zhang Jun
    Sun Quanxin
    2014 INTERNATIONAL SYMPOSIUM ON SAFETY SCIENCE AND TECHNOLOGY, 2015, 84 : 195 - 203
  • [8] Study on the Model of Integrated Risk Management for BOT Projects
    Jiang, Gongliang
    ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 3374 - 3377
  • [9] Risk management in construction projects
    Szymanski, Pawel
    INNOVATIVE SOLUTIONS IN CONSTRUCTION ENGINEERING AND MANAGEMENT: FLEXIBILITY IN SUSTAINABLE CONSTRUCTION, 2017, 208 : 174 - 182
  • [10] Risk management in construction projects
    Iqbal, Shahid
    Choudhry, Rafiq M.
    Holschemacher, Klaus
    Ali, Ahsan
    Tamosaitiene, Jolanta
    TECHNOLOGICAL AND ECONOMIC DEVELOPMENT OF ECONOMY, 2015, 21 (01) : 65 - 78