共 50 条
- [42] Time and Cost trade-off using multi-objective task scheduling in utility Grids PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON COMPUTER AND KNOWLEDGE ENGINEERING (ICCKE 2013), 2013, : 362 - 367
- [43] Using ant colony algorithm to solve construction time-cost trade-off problem Zhejiang Daxue Xuebao (Gongxue Ban), 2007, 1 (176-180):
- [44] MANAGING NEW PRODUCT TIME TO MARKET USING TIME-COST TRADE-OFF METHODS OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1988, 16 (02): : 117 - 124
- [46] Construction time-cost trade-off analysis using ant colony optimization algorithm PROCEEDINGS OF THE 2006 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (13TH), VOLS 1-3, 2006, : 2039 - 2044
- [47] CONSTRUCTION TIME-COST TRADE-OFF ANALYSIS USING LP/IP HYBRID METHOD JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1995, 121 (04): : 446 - 454
- [48] Trade-off analysis between cost and reliability of water distribution systems using genetic algorithms INTEGRATING WATER SYSTEMS, 2010, : 687 - 693
- [49] PRIVACY-COST TRADE-OFF IN A SMART METER SYSTEM WITH A RENEWABLE ENERGY SOURCE AND A RECHARGEABLE BATTERY 2019 IEEE INTERNATIONAL CONFERENCE ON ACOUSTICS, SPEECH AND SIGNAL PROCESSING (ICASSP), 2019, : 2687 - 2691
- [50] Time-cost Trade-off Analysis of Project Using Fuzzy-Genetic Approach ECONOMICS AND SOCIAL SCIENCE, 2013, 13 : 121 - 126