Modelling of input data uncertainty for the financial evaluation of complex infrastructure projects

被引:0
|
作者
Beisler, M. [1 ]
Klapperich, H. [2 ]
Jacob, D. [3 ]
Schweiger, H. [4 ]
机构
[1] ILF Beratende Ingenieure ZT Gesell mbH, A-6063 Rum Innsbruck, Austria
[2] TU Bergakad Freiberg, Inst Geotech, Lehrstuhl Bodenmech Bergbauliche Geotech & Grundb, D-09596 Freiberg, Germany
[3] TU Bergakad Freiberg, Lehrstuhl ABWL, Fak Wirtschaftswissensch, D-09596 Freiberg, Germany
[4] Graz Univ Technol, Inst Bodenmech & Grundbau, A-8010 Graz, Austria
来源
BAUINGENIEUR | 2013年 / 88卷
关键词
RANDOM SET-THEORY; RELIABILITY-ANALYSIS;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The planning of complex infrastructure projects represents an interdisciplinary process, which is characterised and heavily influenced by uncertain information and imprecise input parameters. During early planning stages the majority of technical as well as economic parameters, which are of crucial importance for the detailed design and project implementation, cannot be determined with precision. It is therefore common practice that these figures are selected as deterministic values, which require extensive optimisation throughout subsequent planning stages. A major disadvantage inherent to commonly used deterministic analysis is the lack of objectivity for the selection of input parameters. Moreover, it cannot be ensured that the entire existing parameter range and all possible parameter combinations are covered. Probabilistic methods utilise discrete probability distributions or parameter input ranges to cover the entire range of uncertainties resulting from an information deficit during the planning phase and integrate them into the optimisation process by means of alternative calculation methods. In the field of geotechnical engineering this approach has been employed successfully to objectively account for uncertainties related to geological conditions and material properties in the context of design analysis. The article examines to what extent the random set theory (RST) is suitable as a reliable, scientific methodology that can be utilised for handling of vague information and imprecise input parameters in the context of economic project appraisal. The primary applications of RST in this context are the identification, analysis and management of project risks. The method can also be utilised to stipulate and evaluate the decision criteria, which are used to support the process of investment decision making. Furthermore the RST can represent a suitable instrument for the re-evaluation of a project's feasibility under changed technical and economic boundary conditions. This is of particular interest for energy projects such as hydro-power generation, under consideration of the steadily increasing energy prices and a significantly growing demand for renewable energy (compare Pottler [13]).
引用
收藏
页码:78 / 88
页数:11
相关论文
共 50 条
  • [31] The financial additionality and viability of CDM projects allowing for uncertainty
    David G. Carmichael
    Kjell A. Lea
    Maria C. A. Balatbat
    Environment, Development and Sustainability, 2016, 18 : 129 - 141
  • [32] Input modelling for financial simulations using the bootstrap
    Huang, H.
    Willemain, T. R.
    JOURNAL OF SIMULATION, 2006, 1 (01) : 39 - 52
  • [33] Taxonomy of uncertainty in environmental life cycle assessment of infrastructure projects
    Saxe, Shoshanna
    Guven, Gursans
    Pereira, Lucas
    Arrigoni, Alessandro
    Opher, Tamar
    Roy, Adrien
    Arceo, Aldrick
    Von Raesfeld, Sofia Sampedro
    Duhamel, Mel
    McCabe, Brenda
    Panesar, Daman K.
    MacLean, Heather L.
    Posen, I. Daniel
    ENVIRONMENTAL RESEARCH LETTERS, 2020, 15 (08)
  • [34] Evaluating Infrastructure Projects under Risk and Uncertainty: A Checklist of Issues
    Clarke, Harry
    AUSTRALIAN ECONOMIC REVIEW, 2014, 47 (01) : 147 - 156
  • [35] Multicriteria analysis of the financial feasibility of transport infrastructure projects in Hungary
    Bekefi, Z
    Kiss, LN
    Tanczos, K
    INFOR, 2003, 41 (01) : 105 - 126
  • [36] Coping with uncertainty and ambiguity through team collaboration in infrastructure projects
    Walker, Derek H. T.
    Davis, Peter R.
    Stevenson, Andrew
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2017, 35 (02) : 180 - 190
  • [37] Predictive Model of Contractor Financial Effort in Transport Infrastructure Projects
    Purnus, Augustin
    Bodea, Constanta-Nicoleta
    CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 : 746 - 753
  • [38] FORECASTING DEMAND ON MEGA INFRASTRUCTURE PROJECTS: INCREASING FINANCIAL FEASIBILITY
    Husin, Albert Eddy
    Berawi, Mohammed Ali
    Dikun, Suyono
    Ilyas, Tommy
    Berawi, Abdur Rohim Boy
    INTERNATIONAL JOURNAL OF TECHNOLOGY, 2015, 6 (01) : 73 - 83
  • [39] South American infrastructure projects facing the international financial crisis
    Bogado Bordazar, Laura Lucia
    Maira Bono, Laura
    RELACIONES INTERNACIONALES, 2009, 18 (36) : 61 - 75
  • [40] Capacities of Financial and Credit Support of Infrastructure Projects in the Russian Federation
    Grinko, Elena L.
    Cheremysynova, Diana V.
    Tarasenko, Sergey V.
    EDUCATION EXCELLENCE AND INNOVATION MANAGEMENT THROUGH VISION 2020, 2019, : 6912 - 6920