Scheduling two-stage hybrid flow shop with availability constraints

被引:79
|
作者
Allaoui, H
Artiba, A
机构
关键词
D O I
10.1016/j.cor.2004.09.034
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Most of the literature on scheduling assumes that machines are always available. However, in real life industry, machines may be subject to some unavailability periods due to maintenance activities such as breakdowns (stochastic case) and preventive maintenance (deterministic case). In this paper we investigate the two-stage hybrid flow shop scheduling problem with only one machine on the first stage and m machines on the second stage to minimize the makespan. We consider that each machine is subject to at most one unavailability period. The start time and the end time of each period are known in advance (deterministic case) and only the non-resumable case is studied. First we discuss the complexity of the problem. Afterwards, we give the Branch and Bound model for this problem. Last, we calculate the worst-case performances of three heuristics: LIST algorithm, LPT algorithm and H-heuristic. (c) 2004 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1399 / 1419
页数:21
相关论文
共 50 条
  • [31] Scheduling in aerospace composite manufacturing systems: a two-stage hybrid flow shop problem
    Azami, Aria
    Demirli, Kudret
    Bhuiyan, Nadia
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2018, 95 (9-12): : 3259 - 3274
  • [32] A hybrid scheduling approach for a two-stage flexible flow shop with batch processing machines
    Tan, Yi
    Moench, Lars
    Fowler, John W.
    JOURNAL OF SCHEDULING, 2018, 21 (02) : 209 - 226
  • [33] An Approximation Scheme for Heterogeneous Parallel Task Scheduling in a Two-Stage Hybrid Flow Shop
    Sun, Jinghao
    Meng, Yakun
    JOURNAL OF INFORMATION SCIENCE AND ENGINEERING, 2015, 31 (04) : 1291 - 1308
  • [34] A comparison between basic cyclic scheduling and variable cyclic scheduling in a two-stage hybrid flow shop
    Tsubone, H
    Suzuki, M
    Uetake, T
    Ohba, M
    DECISION SCIENCES, 2000, 31 (01) : 197 - 222
  • [35] ON THE TWO-STAGE HYBRID FLOW SHOP WITH DEDICATED MACHINES
    Hadda, Hatem
    Hajji, Mohamed Karim
    Dridi, Najoua
    RAIRO-OPERATIONS RESEARCH, 2015, 49 (04) : 795 - 804
  • [36] A two-stage flow shop scheduling problem with transportation considerations
    Chikhi, Nacira
    Abbas, Moncef
    Benmansour, Rachid
    Bekrar, Abdelghani
    Hanafi, Said
    4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2015, 13 (04): : 381 - 402
  • [37] A two-stage flow shop scheduling problem with transportation considerations
    Nacira Chikhi
    Moncef Abbas
    Rachid Benmansour
    Abdelghani Bekrar
    Saïd Hanafi
    4OR, 2015, 13 : 381 - 402
  • [38] BATCH SCHEDULING IN A TWO-STAGE FLEXIBLE FLOW SHOP PROBLEM
    Gerstl, Enrique
    Mosheiov, Gur
    Sarig, Assaf
    FOUNDATIONS OF COMPUTING AND DECISION SCIENCES, 2014, 39 (01) : 3 - 16
  • [39] A note on scheduling of two-stage flow shop with multiple processors
    Suresh, V
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1997, 49 (01) : 77 - 82
  • [40] Approximation algorithms for two-stage flexible flow shop scheduling
    Zhang, Minghui
    Lan, Yan
    Han, Xin
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2020, 39 (01) : 1 - 14