Lean Construction Methods to Eliminate Waste

被引:0
|
作者
Cao Zhen [1 ]
Su Zhenmin [1 ]
机构
[1] Nanjing Univ Technol, Coll Management Sci & Engn, Nanjing 210009, Jiangsu, Peoples R China
关键词
lean construction; eliminate waste; pull; last planner system; team work;
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
There are a lot of wastes in the current construction process, leading to low-efficiency and waste of resources. Elimination of waste itself is a means of pursuing the maximum value, and is of great significance to the construction industry. An increasing number of international organizations and agencies have started their lean construction research and practice. Their practice experiences have proved that lean construction is one of the most effective tools for eliminating wastes. Lean principles of eliminating waste include Pull-Just In Time (JIT) production, the Last Planner System and Team Work. In this paper, these three principles are going to be discussed; which will help people in implementing lean construction in practice.
引用
收藏
页码:753 / 756
页数:4
相关论文
共 50 条
  • [31] A literature review about "waste" concept studies in construction under Lean principles
    Castano-Jimenez, Patricia
    Sanchez-Jurado, Janeth
    Garcia-Londono, Juanita
    UIS INGENIERIAS, 2021, 20 (04): : 27 - 44
  • [32] An Appraisal of Lean Construction Project Delivery Application of Lean Construction
    Ruan, Ximing
    Ochieng, Edward
    Zuofa, Tarila
    Yang, Miying
    2016 INTERNATIONAL CONFERENCE ON LOGISTICS, INFORMATICS AND SERVICE SCIENCES (LISS' 2016), 2016,
  • [33] Exploring Decision-Making Methods in Lean Construction Tool Selection
    Turkyilmaz, Osman Hulusi
    Besiktepe, Deniz
    CONSTRUCTION RESEARCH CONGRESS 2024: CONTRACTING, DELIVERY, SCHEDULING, ESTIMATING, ECONOMICS, AND ORGANIZATIONAL MANAGEMENT AND PLANNING IN CONSTRUCTION, 2024, : 382 - 392
  • [34] CONSTRUCTION CLAIMS - LITIGATE OR ELIMINATE
    GOLDBLOOM, J
    CONSULTING ENGINEER, 1984, 63 (03): : 53 - 54
  • [35] The effects of suitability and acceptability of lean principles in the flow of waste management on construction project performance
    Rosli, Muhammad Faiz
    Tamyez, Puteri Fadzline Muhammad
    Zahari, Abdul Rahman
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (01) : 114 - 125
  • [36] The Application of Selected Lean Methods for Waste Removal in Logistics of Slovak Industrial Plants
    Vidova, Helena
    Belusky, Martin
    III CENTRAL EUROPEAN CONFERENCE ON LOGISTICS, 2013, 309 : 286 - 293
  • [37] Applying Lean Construction to Construction Project
    Nguyen Thanh Binh
    RESEARCH IN MATERIALS AND MANUFACTURING TECHNOLOGIES, PTS 1-3, 2014, 835-836 : 1976 - 1983
  • [38] Lean construction and safety
    Reis, A. M.
    Zeglin, B. V.
    Vergara, L. L. G.
    OCCUPATIONAL SAFETY AND HYGIENE VI, 2018, : 573 - 576
  • [39] Lean construction and simulation
    Halpin, DW
    Kueckmann, M
    PROCEEDINGS OF THE 2002 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2002, : 1697 - 1703
  • [40] WATER MANAGEMENT TO ELIMINATE WATER WASTE
    RICE, JK
    MECHANICAL ENGINEERING, 1966, 88 (11) : 82 - &