Emergency Capability Evaluation Method of Engineering Project

被引:0
|
作者
Yan, Zhigang [1 ]
Wang, Xueli [1 ]
Fu, Yingchun [1 ]
机构
[1] Shijiazhuang Inst Railway Technol, Shijiazhuang, Peoples R China
关键词
emergency capability; engineering project; evaluation; fuzzy evaluation; AHP;
D O I
暂无
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
Because the engineering project faced by a construction enterprise is extremely complex, the engineering construction enterprise is a risky industry and engineering accidents often cause the heavy property loss and personal injury. For an engineering construction enterprise, the high-efficiency emergency capability is very important to reduce casualties and property loss when a accident happened. Relative to urban traffic, public health and other industries, the emergency management studies of construction engineering project are very lack. Based on process management theory, this paper designed a set of emergency management evaluation indexes system. And with AHP and fuzzy comprehensive evaluation method, an emergency capability evaluation method of engineering project is designed. By using this method and indexes system, we can get the level of engineering project management about emergency management ability and find the defects of emergency management. Through evaluating a construction engineering project, the results show that this method is an effective way that can enhance emergency management level of construction engineering enterprise.
引用
收藏
页码:266 / 269
页数:4
相关论文
共 50 条
  • [41] Fuzzy comprehensive evaluation of emergency capability of port coal storage base with G1 method
    Sun, Siheng
    Huang, Guozhong
    Jin, Longzhe
    Li, Yage
    Zhao, Xue
    OPERATIONAL AND ENVIRONMENTAL MINE HEALTH AND SAFETY PRACTICE AND INNOVATION, 2016, : 231 - 235
  • [42] A Method for Innovation Capability Evaluation in Banking
    Nu Dieu Khue Ngo
    Van Nam Huynh
    2019 16TH INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT (ICSSSM2019), 2019,
  • [44] Mathematical Method of Shooting Capability Evaluation
    Malanik, Zdenek
    EXPERIMENTALNI ANALYZA NAPETI - EXPERIMENTAL STRESS ANALYSIS, 2011, : 201 - 208
  • [45] Variable Fuzzy Assessment Method and Its Application in the Evaluation of Chemical Industry Park Emergency Response Capability
    Pan Ke
    Jiang Qiuyun
    Yan Shanyu
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL. VIII, PTS A AND B, 2010, 8 : 171 - 176
  • [46] EMERGENCY CHILD CARE SERVICE - EVALUATION OF A PROJECT
    MILLER, MK
    FAY, HJ
    CHILD WELFARE, 1969, 48 (08) : 496 - 499
  • [47] Evaluation of an emergency contraception introduction project in Kenya
    Muia, E
    Blanchard, K
    Lukhando, M
    Olenja, J
    Liambila, W
    CONTRACEPTION, 2002, 66 (04) : 255 - 260
  • [48] Construction engineering project quality evaluation method based on fuzzy analytic hierarchy process
    Shao, Hui
    Fu, Haijian
    2015 INTERNATIONAL CONFERENCE ON INTELLIGENT TRANSPORTATION, BIG DATA AND SMART CITY (ICITBS), 2016, : 228 - 231
  • [49] Study on the Evaluation Method of Engineering General Contracting Enterprises Multi-project Selection
    Wu, Xinhua
    Tang, Na
    Liu, Fengzhen
    ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 3258 - +
  • [50] Research on Project Risk Management of Power Engineering Based on Fuzzy Comprehensive Evaluation Method
    Zheng Lixin
    AUTOMATIC CONTROL AND MECHATRONIC ENGINEERING II, 2013, 415 : 287 - 293