Emergency Capability Evaluation Method of Engineering Project

被引:0
|
作者
Yan, Zhigang [1 ]
Wang, Xueli [1 ]
Fu, Yingchun [1 ]
机构
[1] Shijiazhuang Inst Railway Technol, Shijiazhuang, Peoples R China
关键词
emergency capability; engineering project; evaluation; fuzzy evaluation; AHP;
D O I
暂无
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
Because the engineering project faced by a construction enterprise is extremely complex, the engineering construction enterprise is a risky industry and engineering accidents often cause the heavy property loss and personal injury. For an engineering construction enterprise, the high-efficiency emergency capability is very important to reduce casualties and property loss when a accident happened. Relative to urban traffic, public health and other industries, the emergency management studies of construction engineering project are very lack. Based on process management theory, this paper designed a set of emergency management evaluation indexes system. And with AHP and fuzzy comprehensive evaluation method, an emergency capability evaluation method of engineering project is designed. By using this method and indexes system, we can get the level of engineering project management about emergency management ability and find the defects of emergency management. Through evaluating a construction engineering project, the results show that this method is an effective way that can enhance emergency management level of construction engineering enterprise.
引用
收藏
页码:266 / 269
页数:4
相关论文
共 50 条
  • [21] Emergency Response Capability Evaluation of Power Transmission and Transformation Projects Based on Projection Pursuit Method
    Shuo, Li
    Xin, Fu
    Yuanyuano, He
    JOURNAL OF POWER TECHNOLOGIES, 2024, 104 (02): : 116 - 129
  • [22] Evaluation of the contract reliability for alternative infrastructure project delivery: a contract engineering method
    Wang, Bing
    Cui, Qingbin
    Zhang, Shuibo
    FRONTIERS OF ENGINEERING MANAGEMENT, 2019, 6 (02) : 239 - 248
  • [23] Quality Function Deployment Method and Its Application in Engineering Project Performance Evaluation
    He, Yun
    Mi, Zhongchun
    ECBI: 2009 INTERNATIONAL CONFERENCE ON ELECTRONIC COMMERCE AND BUSINESS INTELLIGENCE, PROCEEDINGS, 2009, : 184 - 187
  • [24] Performance Evaluation Method for Engineering Project Based on DEA/AHP Hybrid Model
    Qin Han
    Lu Juchun
    Proceedings of 2008 International Conference on Construction & Real Estate Management, Vols 1 and 2, 2008, : 254 - 257
  • [25] Evaluation of the contract reliability for alternative infrastructure project delivery: a contract engineering method
    Bing Wang
    Qingbin Cui
    Shuibo Zhang
    Frontiers of Engineering Management, 2019, 6 : 239 - 248
  • [26] Fuzzy Comprehensive Evaluation Method for Risk Assessment in EPC International Engineering Project
    Liu, Ruiyu
    Ye, Ziwan
    PROCEEDINGS OF CHINA-CANADA INDUSTRY WORKSHOP ON ENTERPRISE RISK MANAGEMENT 2008, 2008, : 293 - 299
  • [27] Research on Evaluation of Emergency Capability of City Gas Pipeline
    Li Shi-gui
    Li Xiao-ping
    Liu Jing-cheng
    FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING, PTS 1-8, 2011, 71-78 : 4300 - +
  • [28] An Evaluation of Innovation Capability of Emergency Equipment Enterprise in China
    Liu Hanxiao
    Wang Zhe
    Wang Bo
    PROCEEDINGS OF THE 14TH INTERNATIONAL CONFERENCE ON INNOVATION AND MANAGEMENT, VOLS I & II, 2017, : 579 - 583
  • [29] Study on Evaluation of the City Gas Emergency Response Capability
    Yin Yi-lin
    Lin Guang-li
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON LOGISTICS SYSTEMS AND INTELLIGENT MANAGEMENT, VOLS 1-3, 2010, : 1683 - 1686
  • [30] Research on Evaluation System of Earthquake Emergency Preparedness Capability
    Wang Zhan-ying
    Tan Qing-quan
    Liu Qun
    Li Yan
    PROCEEDINGS OF ISCRAM ASIA 2012 CONFERENCE ON INFORMATION SYSTEMS FOR CRISIS RESPONSE AND MANAGEMENT, 2012, : 78 - 82