Accelerated construction for a bridge in rural Texas

被引:0
|
作者
Hyzak, Michael [1 ]
Tang, Benjamin [2 ]
Detwiler, Rachel J.
机构
[1] Texas Dept Transportat TxDOT, Bridge Div, Austin, TX USA
[2] Oregon Dept Transportat, Salem, OR USA
来源
PCI JOURNAL | 2013年
关键词
ABC; accelerated bridge construction; analytical hierarchy; bridge replacement; decision making;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper illustrates the use of a hierarchical decision tool to evaluate whether to use accelerated bridge construction (ABC) to replace a bridge in a rural area. County Route EE over Gageby Creek in the Texas Panhandle carries a great deal of truck traffic related to the oil and gas industry in the area. The lack of suitable alternate routes strongly influenced the decision to use ABC. Because customer service was heavily weighted compared with other high-level criteria, such as direct and indirect costs, ABC was the favored alternative. This example shows how ABC may prove appropriate even for a simple bridge in an isolated area.
引用
收藏
页码:32 / 36
页数:5
相关论文
共 50 条
  • [1] Accelerated Bridge Construction
    Azizinamini, Atorod
    JOURNAL OF BRIDGE ENGINEERING, 2020, 25 (12)
  • [2] GASS accelerated Bridge construction
    不详
    BAUINGENIEUR, 2011, 86 : A21 - A21
  • [3] Accelerated bridge construction a good read
    Tang, Benjamin
    PCI JOURNAL, 2013, : 11 - 11
  • [4] A decision tool for accelerated bridge construction
    Saeedi, Amirali
    Emami, Samin
    Doolen, Toni L.
    Tang, Benjamin
    PCI JOURNAL, 2013, : 48 - 63
  • [5] Foundation solutions for accelerated bridge construction
    Attanayake, U. B.
    Aktan, H. M.
    MAINTENANCE, MONITORING, SAFETY, RISK AND RESILIENCE OF BRIDGES AND BRIDGE NETWORKS, 2016, : 325 - 325
  • [6] Accelerated bridge construction a good read
    Tang, Benjamin
    PCI Journal, 2013, 58 (04):
  • [7] Substructure solutions for accelerated bridge construction
    Ranasinghe, A. P.
    MAINTENANCE, MONITORING, SAFETY, RISK AND RESILIENCE OF BRIDGES AND BRIDGE NETWORKS, 2016, : 326 - 326
  • [8] Foundation Reuse in Accelerated Bridge Construction
    Davis, Nathan T.
    Hoomaan, Ehssan
    Agrawal, Anil K.
    Sanayei, Masoud
    Jalinoos, Farrokh ''Frank''
    JOURNAL OF BRIDGE ENGINEERING, 2019, 24 (10)
  • [9] Accelerated Bridge Construction of the New Samuel De Champlain Bridge
    Nader, Marwan
    JOURNAL OF BRIDGE ENGINEERING, 2020, 25 (02)
  • [10] Accelerated bridge construction using precast segmental bridge piers
    Ranasinghe, A. P.
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE EXTENSION, 2014, : 1565 - 1569