A genetic algorithm-based method for look-ahead scheduling in the finishing phase of construction projects

被引:22
|
作者
Dong, Ning [1 ]
Ge, Dongdong [2 ]
Fischer, Martin [1 ]
Haddad, Zuhair [3 ]
机构
[1] Stanford Univ, CIFE, Stanford, CA 94305 USA
[2] Shanghai Jiao Tong Univ, Antai Coll Econ & Management, Shanghai 200052, Peoples R China
[3] Consolidated Contractors Int Co CCC, Corp Affairs & CIO, Athens 15110, Greece
关键词
Look-ahead schedule (LAS); Genetic algorithm (GA); Simulation; RCPSP; RCMPSP; SEARCH;
D O I
10.1016/j.aei.2012.03.004
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Genetic algorithms (GAs) are widely used in finding solutions for resource constrained multi-project scheduling problems (RCMPSP) in construction projects. In the finishing phase of a complex construction project, each room forms a confined space for crews to conduct a series of activities and can thus be considered as an individual sub-project. Generating the look-ahead schedule (LAS) which takes into account the limited resources available at the job site falls in the domain of RCMPSP. Therefore GAs can be used to address this scheduling problem and help construction managers to guide the daily work on site. However, current GAs do not consider three key practical aspects that the project planers and construction managers deal with frequently at the job sites: the engineering priorities of each individual sub-project, the zone constraint and the blocking constraint. By addressing these aspects, this paper proposes a GA-based method that takes them into account in the search process for optimum project duration and/or cost. Two examples are used for the discussion of the effectiveness of this method and to showcase its capability in project scheduling when the scale of a project increases. (C) 2012 Elsevier Ltd. All rights reserved.
引用
收藏
页码:737 / 748
页数:12
相关论文
共 50 条
  • [31] High-performance CORDIC rotation algorithm based on look-ahead techniques
    Kao, Chi-Chou
    INTERNATIONAL JOURNAL OF ELECTRONICS, 2011, 98 (08) : 1075 - 1089
  • [32] Nested Look-Ahead Evolutionary Algorithm Based Planning for a Believable Diplomacy Bot
    Kemmerling, Markus
    Ackermann, Niels
    Preuss, Mike
    APPLICATIONS OF EVOLUTIONARY COMPUTATION, PT I, 2011, 6624 : 83 - +
  • [33] Genetic algorithm-based optimization of routing and scheduling for logistics
    Hu, XD
    Wei, QF
    CONCURRENT ENGINEERING: THE WORLDWIDE ENGINEERING GRID, PROCEEDINGS, 2004, : 959 - 962
  • [34] Automated Resource Scheduling for Construction Projects Using Genetic Algorithm
    Moharram, Raghda M.
    Essawy, Yasmeen A. S.
    Hosny, Osama S.
    PROCEEDINGS OF THE CANADIAN SOCIETY OF CIVIL ENGINEERING ANNUAL CONFERENCE 2022, VOL 1, CSCE 2022, 2023, 363 : 513 - 522
  • [35] A genetic algorithm-based approach for job shop scheduling
    Phanden, Rakesh Kumar
    Jain, Ajai
    Verma, Rajiv
    JOURNAL OF MANUFACTURING TECHNOLOGY MANAGEMENT, 2012, 23 (07) : 937 - 946
  • [36] A fine-interpolation-based parametric interpolation method with a novel real-time look-ahead algorithm
    Jin, Yu-an
    He, Yong
    Fu, Jian-zhong
    Lin, Zhi-wei
    Gan, Wen-feng
    COMPUTER-AIDED DESIGN, 2014, 55 : 37 - 48
  • [37] Look-ahead reservation-based scheduling for input-output buffered ATM switch
    Pao, DCW
    Lam, SP
    IEE PROCEEDINGS-COMMUNICATIONS, 1998, 145 (04): : 234 - 240
  • [38] Look-Ahead Based Method for Selection of Preventive Control for Voltage Stability Analysis
    Mansour, M. R.
    Alberto, L. F. C.
    Ramos, R. A.
    2012 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL TECHNOLOGY (ICIT), 2012, : 469 - 473
  • [39] Multi-UAV Formation Path Planning Based on Compensation Look-Ahead Algorithm
    Sun, Tianye
    Sun, Wei
    Sun, Changhao
    He, Ruofei
    DRONES, 2024, 8 (06)
  • [40] Best response-based individually look-ahead scheduling for natural gas and power systems
    Wang, Chong
    Ju, Ping
    Wu, Feng
    Lei, Shunbo
    Pan, Xueping
    APPLIED ENERGY, 2021, 304