A genetic algorithm-based method for look-ahead scheduling in the finishing phase of construction projects

被引:22
|
作者
Dong, Ning [1 ]
Ge, Dongdong [2 ]
Fischer, Martin [1 ]
Haddad, Zuhair [3 ]
机构
[1] Stanford Univ, CIFE, Stanford, CA 94305 USA
[2] Shanghai Jiao Tong Univ, Antai Coll Econ & Management, Shanghai 200052, Peoples R China
[3] Consolidated Contractors Int Co CCC, Corp Affairs & CIO, Athens 15110, Greece
关键词
Look-ahead schedule (LAS); Genetic algorithm (GA); Simulation; RCPSP; RCMPSP; SEARCH;
D O I
10.1016/j.aei.2012.03.004
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Genetic algorithms (GAs) are widely used in finding solutions for resource constrained multi-project scheduling problems (RCMPSP) in construction projects. In the finishing phase of a complex construction project, each room forms a confined space for crews to conduct a series of activities and can thus be considered as an individual sub-project. Generating the look-ahead schedule (LAS) which takes into account the limited resources available at the job site falls in the domain of RCMPSP. Therefore GAs can be used to address this scheduling problem and help construction managers to guide the daily work on site. However, current GAs do not consider three key practical aspects that the project planers and construction managers deal with frequently at the job sites: the engineering priorities of each individual sub-project, the zone constraint and the blocking constraint. By addressing these aspects, this paper proposes a GA-based method that takes them into account in the search process for optimum project duration and/or cost. Two examples are used for the discussion of the effectiveness of this method and to showcase its capability in project scheduling when the scale of a project increases. (C) 2012 Elsevier Ltd. All rights reserved.
引用
收藏
页码:737 / 748
页数:12
相关论文
共 50 条
  • [21] Dynamic Repair Scheduling for Transmission Systems Based on Look-Ahead Strategy Approximation
    Yan, Jiahao
    Hu, Bo
    Xie, Kaigui
    Niu, Tao
    Li, Chunyan
    Tai, Heng-Ming
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2021, 36 (04) : 2918 - 2933
  • [22] LOOK-AHEAD ALGORITHM FOR VELOCITY CONTROL BASED ON PARAMETERIZED CURVE INTERPOLATOR
    REN Kun FU Jianzhong CHEN Zichen College of Mechanical and Energy Engineering
    Chinese Journal of Mechanical Engineering, 2008, (02) : 23 - 26
  • [23] Adaptive real-time tracking and simulation of heavy construction operations for look-ahead scheduling
    Song, Lingguang
    Eldin, Neil N.
    AUTOMATION IN CONSTRUCTION, 2012, 27 : 32 - 39
  • [24] Genetic algorithm-based satellite broadcasting scheduling
    State Key Laboratory of Microwave and Digital Commutation, Department of Electronic Engineering, Tsinghua University, Beijing 100084, China
    Qinghua Daxue Xuebao, 2006, 10 (1699-1702):
  • [25] Scheduling Optimization of Prefabricated Construction Projects by Genetic Algorithm
    Xie, Linlin
    Chen, Yajiao
    Chang, Ruidong
    APPLIED SCIENCES-BASEL, 2021, 11 (12):
  • [26] Optimal appointment scheduling with a stochastic server: Simulation based K-steps look-ahead selection method
    Liu, Changchun
    Xiang, Xi
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2018, 9 (03) : 397 - 408
  • [27] An efficient online geometric simulation algorithm for real-time CNC based on look-ahead method
    Qiu, Tianze
    Dai, Bofang
    Xiao, Wenlei
    Zhao, Chen
    Zhao, Gang
    JOURNAL OF MANUFACTURING SYSTEMS, 2025, 80 : 108 - 125
  • [28] Genetic Algorithm-based Optimal Investment Scheduling for Public Rental Housing Projects in South Korea
    Park, Jae Ho
    Yu, Jung Suk
    Geem, Zong Woo
    INTERNATIONAL JOURNAL OF FUZZY LOGIC AND INTELLIGENT SYSTEMS, 2018, 18 (02) : 135 - 145
  • [29] Research on Look-ahead Adaptive Interpolation of NURBS Based on de Boor Algorithm
    Fan, Y. Q.
    Fu, J. Z.
    Gan, W. F.
    FUNCTIONAL MANUFACTURING TECHNOLOGIES AND CEEUSRO I, 2010, 426-427 : 206 - 211
  • [30] Adaptive Production Control in a Modular Assembly System Based on Partial Look-ahead Scheduling
    Mayer, Sebastian
    Endisch, Christian
    2019 IEEE INTERNATIONAL CONFERENCE ON MECHATRONICS (ICM), 2019, : 293 - 300