The application of Geological radar in forecasting the adverse geological in metamorphic rock area tunnel construction

被引:1
|
作者
Xia, Jiangtao [1 ]
Yang, Chengzhong [2 ]
Wang, Shufang
机构
[1] Huaiyin Inst Technol, Fac Architecture & Civil Engn, Huaian 223001, Peoples R China
[2] East China Jiaotong Univ, Sch Civil Engn, Nanchang 330013, Jiangxi, Peoples R China
关键词
Tunnel engineering; Adverse geological; Electrical characteristics; Forecast;
D O I
10.4028/www.scientific.net/AMR.531.543
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Accurately surveying out the fault, facture zone, water status and other bad geological phenomenon is the key problems for safety and quality in tunnel construction. Based on the different dielectric electrical differences in characteristics, applying geological radar detected the adverse geological in front of the tunnel face and analyzed. The results show the rock in front of tunnel face is broken, the bedding joint is developed, and there is jointed intensive moisture content with the local rich water. In construction process, the support should be strengthened, excavation method should be adjusted).
引用
收藏
页码:543 / +
页数:2
相关论文
共 50 条
  • [31] Intrinsically safe in the tunnel construction under complex geological conditions
    Liu, Hui
    Xie, Zhen
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 1327 - 1330
  • [32] Engineering geological problems of tunnel construction for new highways in Slovakia
    Malgot, J
    Baliak, F
    Kopecky, M
    Benko, B
    EIGHTH INTERNATIONAL CONGRESS INTERNATIONAL ASSOCIATION FOR ENGINEERING GEOLOGY AND THE ENVIRONMENT, PROCEEDINGS, VOLS 1-5, 1998, : 3739 - 3742
  • [33] Groundwater lowering for construction of the Kilsby Tunnel - geological and geotechnical aspects
    Preene, Martin
    Chrimes, Mike M.
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-ENGINEERING HISTORY AND HERITAGE, 2022, 175 (04) : 130 - 144
  • [34] Application of TSP tunnel geological prediction for case study
    Dai, Shulin
    Ma, Chaofang
    MECHATRONICS AND INTELLIGENT MATERIALS II, PTS 1-6, 2012, 490-495 : 1816 - 1820
  • [35] Construction risk evaluation of tunnel based on the GPR geological forecast
    Wen Shi-ru
    Wu Xia
    Yang Xiao-hua
    Wu Xing-Jiao
    Zhang Jian-bin
    2014 Fifth International Conference on Intelligent Systems Design and Engineering Applications (ISDEA), 2014, : 314 - 316
  • [36] Major engineering geological problems in construction of the Kuhrang III tunnel
    Nazer, NHK
    Navai, I
    Vaeziepour, MJ
    EIGHTH INTERNATIONAL CONGRESS INTERNATIONAL ASSOCIATION FOR ENGINEERING GEOLOGY AND THE ENVIRONMENT, PROCEEDINGS, VOLS 1-5, 1998, : 3677 - 3683
  • [37] GEOLOGICAL ASPECTS OF CONSTRUCTION OF THE HAROLD-D-ROBERTS-TUNNEL
    WAHLSTROM, EE
    TRANSACTIONS OF THE SOCIETY OF MINING ENGINEERS OF AIME, 1962, 223 (03): : 291 - 303
  • [38] CONSTRUCTION METHODS AND APPLICATION OF TBM IN SHENGLI TUNNEL OF TIANSHAN MOUNTAIN UNDER POOR GEOLOGICAL CONDITIONS
    Zhao, Zhenping
    Chen, Jianxun
    Geng, Qi
    Li, Dong
    Huang, Dengxia
    Luo, Yanbin
    Liu, Weiwei
    Mu, Shaoping
    Peter Anesu, Kanhenga
    Wu, Teligen
    CIVIL ENGINEERING JOURNAL-STAVEBNI OBZOR, 2024, 33 (02): : 168 - 180
  • [39] Application of engineering geophysical technique in the tunnel geological investigation
    Yang, XD
    Gao, DB
    Lu, JJ
    PROGRESS IN ENVIRONMENTAL AND ENGINEERING GEOPHYSICS, 2004, : 535 - 539
  • [40] Hydrogeochemistry in the coastal area during construction of geological repository
    Kim, Youn-Tae
    Hyun, Seung Gyu
    Cheong, Jae-Yeol
    Woo, Nam C.
    Lee, Sangdeok
    JOURNAL OF HYDROLOGY, 2018, 562 : 40 - 49