Visualizing high-rise building construction strategies using linear scheduling and 4D CAD

被引:61
|
作者
Russell, Alan [1 ]
Staub-French, Sheryl [1 ]
Tran, Ngoc [1 ]
Wong, William [1 ]
机构
[1] Univ British Columbia, Dept Civil Engn, Vancouver, BC V6T 1Z4, Canada
关键词
4D CAD; Linear scheduling; Product modeling; Three-dimensional models; Building information models; Scheduling; Visualization;
D O I
10.1016/j.autcon.2008.08.001
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Project teams face ever increasing pressure to deliver projects as quickly as possible. To meet these demands, contractors are faced with the need to explore various construction strategies in order to meet delivery dates, and to assure themselves as to the achievability and quality of a schedule. Various visual representations of a project's schedule and associated information combined with visual representations of the project in progress, i.e. 4D CAD, can assist with these tasks of identifying effective construction strategies for shortening project duration, assessing their workability, and judging schedule quality. Such visual representations aid communication amongst project staff and facilitate brain-storming, and, implemented well they can provide clear. fast, and multi-climensional feedback to the project team. In this paper, we describe aspects of our work which is directed at formulating a dynamic visualization environment that links 3D CAD, a generalization of traditional CPM which embraces linear scheduling, dual product representations (scheduling and CAD system) and their mapping onto each other, and schedule and CAD graphics in a manner which facilitates the relatively rapid exploration of alternative construction method and scheduling strategies for large scale linear projects (e.g. high-rise buildings, bridges, etc.). Requirements of such an environment include quickness, treating scale, working at multiple levels of detail, dealing with design variability. and realistic representation of the work. Use is made of a realistic example to highlight aspects of our approach and identify important issues that must be addressed if a visualization environment useful for construction professionals is to be developed. (C) 2008 Elsevier B.V. All rights reserved.
引用
收藏
页码:219 / 236
页数:18
相关论文
共 50 条
  • [41] Effects of a Construction Tower Crane on the Wind Loading of a High-Rise Building
    Mara, T. G.
    JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 2010, 136 (11): : 1453 - 1460
  • [42] Field Monitoring of Column Shortenings in a High-Rise Building during Construction
    Choi, Se Woon
    Kim, Yousok
    Kim, Jong Moon
    Park, Hyo Seon
    SENSORS, 2013, 13 (11): : 14321 - 14338
  • [43] Optimization of flexible lift processes on high-rise building construction sites
    Yazdi, Alireza Jalali
    Forsythe, Perry
    Fini, Alireza Ahmadian Fard
    Maghrebi, Mojtaba
    AUTOMATION IN CONSTRUCTION, 2019, 107
  • [44] Robustness of Prefabricated Prefinished Volumetric Construction (PPVC) High-rise Building
    Chua, Y. S.
    Liew, J. Y. R.
    Pang, S. D.
    PROCEEDINGS OF THE 12TH INTERNATIONAL CONFERENCE ON ADVANCES IN STEEL-CONCRETE COMPOSITE STRUCTURES (ASCCS 2018), 2018, : 913 - 919
  • [45] LEAN AND AGILE MANAGEMENT SYNERGY IN CONSTRUCTION OF HIGH-RISE OFFICE BUILDING
    Nowotarski, P.
    Paslawski, J.
    ARCHIVES OF CIVIL ENGINEERING, 2016, 62 (04) : 133 - +
  • [46] Control Strategies for Variable Speed Pumps in Super High-Rise Building
    Wang, Shengwei
    Ma, Zhenjun
    ASHRAE JOURNAL, 2010, 52 (07) : 36 - +
  • [47] Construction Progress Monitoring for High-Rise Building Groups using Digital Surface Model and Orthophoto
    Li, Chengtao
    Ma, Wengang
    Chen, Li
    Hu, Shixiang
    Zhu, Yuqin
    2022 8TH INTERNATIONAL CONFERENCE ON HYDRAULIC AND CIVIL ENGINEERING: DEEP SPACE INTELLIGENT DEVELOPMENT AND UTILIZATION FORUM, ICHCE, 2022, : 1010 - 1016
  • [48] Integrated Offsite Logistics Scheduling Approach for High-Rise Modular Building Projects
    Yang, Yi
    Pan, Mi
    Pan, Wei
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2022, 148 (06)
  • [49] Aspects of scheduling processes and results of the reorganization of projects in high-rise construction objects
    Kazaryan, Ruben
    Pogodin, Denis
    Shatrova, Anastasia
    XXII INTERNATIONAL SCIENTIFIC CONFERENCE: CONSTRUCTION THE FORMATION OF LIVING ENVIRONMENT (FORM-2019), 2019, 97
  • [50] RFID+4D CAD for progress management of structural steel works in high-rise buildings
    Chin, Sangyoon
    Yoon, Suwon
    Choi, Cheolho
    Cho, Changyon
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2008, 22 (02) : 74 - 89