Visualizing high-rise building construction strategies using linear scheduling and 4D CAD

被引:61
|
作者
Russell, Alan [1 ]
Staub-French, Sheryl [1 ]
Tran, Ngoc [1 ]
Wong, William [1 ]
机构
[1] Univ British Columbia, Dept Civil Engn, Vancouver, BC V6T 1Z4, Canada
关键词
4D CAD; Linear scheduling; Product modeling; Three-dimensional models; Building information models; Scheduling; Visualization;
D O I
10.1016/j.autcon.2008.08.001
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Project teams face ever increasing pressure to deliver projects as quickly as possible. To meet these demands, contractors are faced with the need to explore various construction strategies in order to meet delivery dates, and to assure themselves as to the achievability and quality of a schedule. Various visual representations of a project's schedule and associated information combined with visual representations of the project in progress, i.e. 4D CAD, can assist with these tasks of identifying effective construction strategies for shortening project duration, assessing their workability, and judging schedule quality. Such visual representations aid communication amongst project staff and facilitate brain-storming, and, implemented well they can provide clear. fast, and multi-climensional feedback to the project team. In this paper, we describe aspects of our work which is directed at formulating a dynamic visualization environment that links 3D CAD, a generalization of traditional CPM which embraces linear scheduling, dual product representations (scheduling and CAD system) and their mapping onto each other, and schedule and CAD graphics in a manner which facilitates the relatively rapid exploration of alternative construction method and scheduling strategies for large scale linear projects (e.g. high-rise buildings, bridges, etc.). Requirements of such an environment include quickness, treating scale, working at multiple levels of detail, dealing with design variability. and realistic representation of the work. Use is made of a realistic example to highlight aspects of our approach and identify important issues that must be addressed if a visualization environment useful for construction professionals is to be developed. (C) 2008 Elsevier B.V. All rights reserved.
引用
收藏
页码:219 / 236
页数:18
相关论文
共 50 条
  • [21] Optimization of shoring/reshoring levels in high-rise building construction
    Sohoni, Prachi
    Ghaffar, Abdul
    Matsagar, Vasant A.
    Jha, K. N.
    ORGANIZATION TECHNOLOGY AND MANAGEMENT IN CONSTRUCTION, 2018, 10 (01): : 1803 - 1826
  • [22] Steel and composite structural shells in the construction of high-rise building
    Redkin, Andrey
    Baranovskii, Mikhail
    Tarasov, Vladimir
    INTERNATIONAL SCIENTIFIC CONFERENCE WEEK OF SCIENCE IN SPBPU - CIVIL ENGINEERING (SPBWOSCE-2015), 2016, 53
  • [23] Research on transfer floor technology in high-rise building construction
    Zhang, Peng
    2019 INTERNATIONAL CONFERENCE ON ADVANCES IN CIVIL ENGINEERING, ENERGY RESOURCES AND ENVIRONMENT ENGINEERING, 2019, 330
  • [24] ALTERNATIVE METHODS FOR GEODETIC PROVISION OF HIGH-RISE BUILDING CONSTRUCTION
    Nesterenok, M. S.
    SCIENCE & TECHNIQUE, 2009, (06): : 5 - 6
  • [25] Analyzing passive solar strategies in the case of high-rise building
    Lotfabadi, Pooya
    RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2015, 52 : 1340 - 1353
  • [26] Visualizing earthwork and information on a linear infrastructure project using BIM 4D
    Jakobsen, L. Schneider
    Lodewijks, J.
    Gade, P. Norkjaer
    Kjems, E.
    EWORK AND EBUSINESS IN ARCHITECTURE, ENGINEERING AND CONSTRUCTION, 2018, : 177 - 183
  • [27] Modeling labor productivity in high-rise building construction projects using neural networks
    Nguyen, Duc Anh
    Tran, Dung Quang
    Nguyen, Thoan Ngoc
    Tran, Hai Hong
    ARCHIVES OF CIVIL ENGINEERING, 2023, 69 (01) : 675 - 692
  • [28] 4D Modeling and Simulation for the Teaching of Structural Principles and Construction Techniques Towards modeling and visualization guidelines for high-rise buildings
    Kubicki, Sylvain
    Guerriero, Annie
    Leclercq, Pierre
    Nys, Koenraad
    Halin, Gilles
    ECAADE 2012, VOL 1: DIGITAL PHYSICALITY, 2012, : 87 - 95
  • [29] Feasibility study of 4D CAD in commercial construction
    Koo, B
    Fischer, M
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2000, 126 (04): : 251 - 260
  • [30] An evaluation of the applicability of 4D CAD on construction projects
    Mahalingam, Ashwin
    Kashyap, Rahul
    Mahajan, Charudatta
    AUTOMATION IN CONSTRUCTION, 2010, 19 (02) : 148 - 159